Projects in Bidding

Project ID Project No. Description Construction Location Bid Date
BID INFO - CLICK HERE BID INFO - CLICK HERE <----- Questions About Bidding? *Open For More Information*  12/31/2099
CP 0016-259424 TST SP 069-070-028 SP 69-070-028, CP 0016-259424 - Intersection Conflict... Intersection of CSAH 16 and CSAH...  Bidding Closed
SP 69-090-023 SP 69-090-023 SP 69-090-023 Mesabi Trail TH 135 to CSAH 21 South of Tower, MN  Bidding Closed

Projects in Construction

Project ID Project No. Description Construction Location Bid Date
CP 0000-187070 SP 069-070-018 SP 69-070-018 Striping 2016 Various Locations  04/21/2016
CP 0000-204369 SP 069-597-007 SP 69-597-007, CP 0000-204369 - Bridge 48 South of Int. Pine and 2nd St. in...  05/11/2017
CP 0000-213215 SP 069-090-030 SP 69-090-030, CP 0000-213215 - Ped/Bike Trail CSAH 128 to Camp Lake Rd. - CP...  08/11/2016
CP 0000-215963 SAP 069-600-044 SAP 69-600-044, CP 0000-215963 - Reconstruction Rice Lk Dam Rd. between CSAH 4...  10/06/2016
CP 0000-225072 SP 069-070-020 SP 69-070-020, CP 0000-225072 - Striping Various County Highways - CP...  04/14/2016
CP 0000-259422 TST SP 069-070-025 SP 69-070-025, CP 0000-259422 TST - Red Light... 13 Traffic Signals in Duluth &...  03/30/2017
CP 0000-259423 TST SP 069-070-027 SP 069-070-027, CP 0000-259423 - 6" Paint Edgeline... Various County Highways - CP...  04/05/2018
CP 0000-259425 TST SP 088-070-049 SP 088-070-049/SP 069-070-026, CP 0000-259425 TST -... Intersections in Carlton, Itasca...  06/15/2017
CP 0000-259426 SP 088-070-050 CP 0000-259426 SP 088-070-050 - Mainline Dynamic... Mainline Dynamic Warning System in...  05/17/2018
CP 0000-259567 SAP 069-597-008 Br 747 SAP 069-597-008 CP 0000-259567, SAP 069-597-008 Br 747 Cook River Street, City Of Cook D4, P1,...  11/09/2017
CP 0000-275366 CP 0000-275366 CP 0000-275366 - 2017 Maintenance Striping Various County Highways - CP...  06/01/2017
CP 0000-275367 CP 0000-275367 CP 0000-275367 - 2018 Maintenance Striping Various County Highways - CP...  03/08/2018
CP 0000-275389 SAP 069-030-038 SAP 69-030-038, CP 0000-275389 - 2017 Epoxy Wet... Various County State Aid Highways...  06/15/2017
CP 0000-275390 SAP 069-030-039 SAP 69-030-039, CP 0000-275390 Pavement Markings Various County State Aid Highways...  03/15/2018
CP 0000-277015 (Low) CP 0000-277015 (Low) CP 0000-277015 - 2016 Crack Sealing Various Roads within St. Louis...  05/05/2016
CP 0000-278668 CP 0000-278668 CP 0000-278668 - North Crushing 2018 North St. Louis County  04/19/2018
CP 0000-278669 CP 0000-278669 CP 0000-278669 -South Crushing 2018 South St. Louis County  04/12/2018
CP 0000-278670 CP 0000-278670 2018 Crack Sealing Various CSAH and Local Roads...  03/22/2018
CP 0000-286249 SAP 009-606-033 SAP 009-606-033, CP 0000-286249 - Carlton County Chip... CSAH 6 From TH 73 to 516' West of...  03/03/2016
CP 0000-286250 SAP 009-661-027 SAP 009-661-027, CP 0000-286250 - Carlton County Chip... CSAH 61 From Sounty County Line to...  03/03/2016
CP 0000-286251 CP 0000-286251 CP 0000-286251: TLT 2016-1, TLT 2016-2, TLT 2016-3 -... Carlton County - CP 0000-286251...  03/03/2016
CP 0000-293124 SP 069-070-030 SP 069-070-030, CP 0000-293124 - Centerline Rumble... Various County Highways - CP...  04/05/2018
CP 0000-293136 SP 069-070-034 SP 069-070-034, CP 0000-293136 - 6" Solid Line Epoxy... Various County Highways - CP...  04/05/2018
CP 0000-305083 SAP 069-600-045 SAP 069-600-045, CP 0000-305083 - Complete... Commonwealth Ave. between Prescott...  05/17/2018
CP 0000-322853 (Prime) CP 0000-322853 (Prime) CP 0000-322853 (Prime) - Scrub Seal 2017 consisting of... Various Roads in St. Louis County  01/19/2017
CP 0000-323208 (Prime) CP 0000-323208 CP 0000-323208 (Prime)-Chip Seals-Various Roads in St.... Various Roads in St. Louis County  04/06/2017
CP 0000-326330 CP 0000-326330 CP 0000-326330 Itasca Co Project 2017-07 CR 753 Itasca County CR 527 to 800' W of...  12/15/2016
CP 0000-365576 (TIED) CP 0000-365576 (TIED) CP 0000-365576 (TIED) - Meadowlands Western Avenue from Spruce Street...  07/12/2018
CP 0000-371260 (Prime)(Low) CP 0000-371260 CP 0000-371260 - Sealcoating Southern St. Louis County  03/01/2018
CP 0000-375440 (Prime) (Low) CP 0000-375440 (Prime) (Low) CP 0000-375440 (Prime) (Low) - Scrub Seal Northern St. Louis County  03/01/2018
CP 0000-375441 (Prime) CP 0000-375441 CP 0000-375441 (Prime) Chip Seal North 2018 Northern St. Louis County  03/01/2018
CP 0000-388268 (Low), SAP 069-596-011 SAP 069-596-011 CP 0000-388268 (Low), SAP 069-596-011 - Complete... US Highway 2 to Boundary Ave.  05/03/2018
CP 0000-388269 CP 0000-388269 CP 0000-388269 - Complete Reconstruction Ugstad Road to 8th Avenue  05/03/2018
CP 0000-388270 CP 0000-388270 CP 0000-388270 - Complete Reconstruction Almac Drive to 1st Street  05/03/2018
CP 0002-244409 TST CP 0002-244409 TST CP 0002-244409 TST (Low) - Reclaim/Overlay & Culverts CSAH 2 (W. Tischer Rd.) from CSAH...  01/07/2016
CP 0002-261283 CP 0002-261283 TST CP 0002-261283 TST (Tied) - Reclaim & Overlay CSAH 2 (W. Tischer Rd.) from CSAH...  01/07/2016
CP 0003-216102 (Low Prime) CP 0003-216102 LOW PRIME CP 0003-216102, Reclaim & Overlay CSAH 3 (Becks Rd.) from Carlton...  05/04/2017
CP 0003-244396 (Low) SAP 069-603-015 SAP 069-603-015(Low) CP 0003-244396 - Reclaim & Overlay CSAH 3 (Becks Rd.) from TH 23 to...  03/08/2018
CP 0004-136147 SP 069-604-073 SP 69-604-073 TST, CP 0004-136147 - Sidewalk CSAH 4 (Rice Lake Road) from...  05/26/2016
CP 0004-213068 SAP 069-604-076 SAP 69-604-076, CP 0004-213068 - Bridge #414 CR 4 (Vermilion Trail) between CR...  06/04/2015
CP 0004-216101 SAP 069-604-077 SAP 69-604-077(Low), CP 0004-216101 (TST), Reclaim &... CSAH 4 (Vermilion Trail) from CR...  10/22/2015
CP 0004-226569 SAP 069-604-075 SAP 69-604-075, CP 0004-226569 TST (Low) - Traffic... Intersection of Rice Lake Rd. and...  06/02/2016
CP 0004-252401 TST CP 0004-252401 TST CP 0004-252401 TST (Tied) - Bypass Lane CSAH 4 (Rice Lake Rd.)...  06/02/2016
CP 0005-204368 SP 069-605-044 SP 69-605-044, CP 0005-204368 - Bridge 698 CSAH 5 between CR 962 and CR 501 -...  12/15/2016
CP 0005-211976 SAP 069-605-045 SAP 69-605-045, CP 0005-211976 (Low) - 2016 Chip Seal:... CSAH 5 (Hwy 5) from TH 37 to CSAH...  02/04/2016
CP 0005-255874 (Low) SAP 069-605-047 CP 0005-255874 (Low); SAP 069-605-047, CSAH 22 to TH 1... CSAH 5 (Hwy 5) from CSAH 22 (Hwy...  02/22/2018
CP 0005-257590 TST CP 0005-257590 TST CP 0005-257590 TST (Low) - Reclaim & Overlay CSAH 5 from Side Lake to Snake...  12/15/2016
CP 0005-287158 (Low) CP 0005-287158 (Low) CP 0005-287158 (Low) - Scrub Seal CSAH 84 to CSAH 81 - CP...  03/31/2016
CP 0005-289397 CP 0005-289397 CP 0005-289397 (Tied) Culvert Replacement 150' South of CR 743 to 950' South...  06/02/2016
CP 0006-356728 SAP 069-606-026 SAP 069-606-026, CP 0006-356728 Traffic Signal Systems... Various Intersections on CSAH 6,...  05/17/2018
CP 0006-374585 (Tied) SAP 069-606-027 CP 0006-374585 - Sealcoating TH 2 to CSAH 13 (Midway Road)  03/01/2018
CP 0007-208919 SP 069-607-050 SP 69-607-050, CP 0007-208919 - Reclaim & Overlay CSAH 7 from W. Jct. CSAH 47 to...  03/02/2017
CP 0007-241426 SAP 069-607-051 SAP 69-607-051(Low), CP 0007-241426 - Chip Seal CSAH 7 (Industrial Rd.) from TH 53...  03/03/2016
CP 0009-147349 SP 069-609-040 SP 69-609-040, CP 0009-147349 TST - Reconstruction CSAH 9 (4th St./Wallace Ave.) from...  06/09/2016
CP 0009-153304 CP 0009-153304 (Tied) CP 0009-153304 (Tied) - Scrub Seal CSAH 121 (E. Calvary Rd.) to MSA...  03/31/2016
CP 0009-241306 (TST) CP 0009-241306 CP 0009-241306(Low) (TST) - Reclaim & Overlay CR 9 (N. Pike Lake Rd.) from Helm...  05/14/2015
CP 0010-295530 CP 0010-295530 CP 0010-295530 - Culvert Replacement 500' North of W. Tischer to 1,000'...  07/21/2016
CP 0011-278904 SAP 069-611-018 SAP 69-611-018, CP 0011-278904 (Low) - Mill & Overlay CSAH 11 (4th St./5th Ave.) from CR...  05/04/2017
CP 0013-153307 SAP 069-613-040 SAP 69-613-040 Tied, CP 0013-153307 - Mill & Overlay CSAH 13 (Midway Rd.) from TH 194...  05/14/2015
CP 0013-211986 CP 0013-211986 CP 0013-211986 Tied, Chip Seal: CSAH 14 to TH 2 CSAH 13 (Midway Rd.) from CSAH 14...  03/03/2016
CP 0013-247751 TST SAP 069-613-041 SAP 69-613-041, CP 0013-247751 TST - Traffic Warning... CSAH 13 (Midway Rd.) .5 Mi. South...  06/30/2016
CP 0013-249390 CP 0013-249390 CP 0013-249390 Tied - Chip Seal 361' N. of TH 2 to TH 194 - CP...  03/03/2016
CP 0013-259418 TST SP 069-070-024 SP 69-070-024, CP 0013-259418 TST - Mainline Dynamic... Intersection of CSAH 13 and CSAH...  03/23/2017
CP 0013-319131 TST SAP 069-613-042 CP 0013-319131, SAP 069-613-042 - Roundabout Intersection of CSAH 13 (Midway...  02/15/2018
CP 0014-278072 SAP 069-614-017 SAP 069-614-017, CP 0014-278072 (Low Prime) - Mill &... CSAH 14 (Boundary Ave.) from 400'...  07/20/2017
CP 0014-278073 SAP 069-614-018 SAP 069-614-018, CP 0014-278073 (Tied) - Reclaim &... CSAH 14 (5th St.) from TH 2 to...  05/04/2017
CP 0016-153268 SAP 069-616-053 SAP 69-616-053, CP 0016-153268 (Low) CSAH 16, Townline Rd from CSAH 7...  12/04/2014
CP 0016-153442 TST SAP 069-616-056 SAP 69-616-056, CP 0016-153442 TST - Mill & Overlay CSAH 16 (Townline Rd.) from 1.84...  05/07/2015
CP 0016-207383 SAP 069-616-054 SAP 69-616-054, CP 0016-207383 (Tied) - Reclaim/Overlay CSAH 16 (Townline Rd.) from CSAH 5...  12/04/2014
CP 0016-275997 SAP 069-616-057 SAP 69-616-057, CP 0016-275997 (Tied) - Chip Seal CSAH 16 from TH 73 to CSAH 7 - CP...  02/04/2016
CP 0016-289398 TST CP 0016-289398 TST (Low) CP 0016-289398 TST (Low) - Reclaim & Overlay Itasca County Line to TH 73 - CP...  06/02/2016
CP 0018-289399 TST CP 0018-289399 TST (Tied) CP 0018-289399 TST (Tied) - Reclaim & Overlay Itasca County Line to TH 73 - CP...  06/02/2016
CP 0021-215030 SAP 069-621-034 SAP 69-621-034, CP 0021-215030 TST, Bridge #286 1.1 mi N of Jct CSAH 70 over Birch...  03/31/2016
CP 0022-153313 (Tied) SAP 069-622-022 CP 0022-153313 (Tied); SAP 069-622-022, CSAH 5 To TH... CSAH 22 (Hwy 22) from CSAH 5 to TH...  02/22/2018
CP 0022-287160 CP 0022-287160 (Tied) CP 0022-287160 (Tied) - Scrub Seal TH 73 to TH 53 - CP 0022-287160...  03/31/2016
CP 0022-9313 (Tied) CP 0022-9313 (Tied) CP 0022-9313 TST (Tied), County Line to CSAH5 -... Itasca County Line to CSAH 5 - CP...  02/22/2018
CP 0023-280020 SAP 069-623-035 SAP 69-623-035, CP 0023-280020 (Tied) - Chip Seal Lakeshore Drive (Nett Lake) to TH...  02/04/2016
CP 0023-72711 SP 069-623-032 SP 69-623-032, CP 0023-72711 TST - Reclaim & Overlay CSAH 23 (Orr-Buyck Rd.) from 0.4...  03/03/2016
CP 0024-229056 CP 0024-229056 TST CP 0024-229056 TST (Low) - Bridge 361 CSAH 24 (Kallio Rd.) from .65 Mi....  04/28/2016
CP 0024-278063 SAP 069-624-024 SAP 69-624-024, CP 0024-278063 (Tied) - Chip Seal TH 53 to CSAH 115 - CP 0024-278063...  02/04/2016
CP 0024-278064 SAP 069-624-023 SAP 69-624-023, CP 0024-278064 (Tied) - Chip Seal CSAH 115 to CR 426 - CP...  02/04/2016
CP 0024-338060 (LOW PRIME) CP 0024-338060 CP 0024-338060-GRIP 426 to 8121 C.R. 426 E. 11.354 Miles to N....  03/23/2017
CP 0025-153449 CP 0025-153449 CP 0025-153449 (Tied) - Chip Seal CSAH 25 (Hwy 25) from TH 37 to TH...  02/04/2016
CP 0025-207531 SAP 069-625-013 SAP 69-625-013, CP 0025-207531 (Tied)- Reclaim &... CSAH 25 (Hwy 25) from TH 37 to TH...  12/04/2014
CP 0025-275062 TST (Prime) CP 0025-275062 TST CP 0025-275062 TST (Prime) - Guardrail Bridge 679 - .61 Mi. South of CR...  09/29/2016
CP 0025-287161 CP 0025-287161 (Tied) CP 0025-287161 (Tied) - Scrub Seal CSAH 125 to CSAH 65 (North...  03/31/2016
CP 0025-287162 CP 0025-287162 (Tied) CP 0025-287162 (Tied) - Scrub Seal UT 8163 to CSAH 82 - CP...  03/31/2016
CP 0025-365478 (Low) SAP 069-625-017 CP 0025-365478 (Low), SAP 069-625-017 CR 661 to TH 37... CR 661 to TH 37  03/29/2018
CP 0026-275030 (Low) SAP 069-626-012 CP 0026-275030 (Low), SAP 069-626-012 TH 169 to TH... CSAH 26, Wahlsten Rd, D4, P2, TH...  02/15/2018
CP 0026-275994 (Tied) SAP 069-626-013 CP 0026-275994 (Tied), SAP 069-626-013 TH 135 to CSAH... CSAH 26, Wahlsten Rd, D4, P2, TH...  02/15/2018
CP 0026-304816 CP 0026-304816 (Low) CP 0026-304816 (Low) TST; CP 0068-304825 TST (Tied)... CR 969 (Forest Rd.) to CSAH 21 -...  02/09/2017
CP 0031-249391 CP 0031-249391 CP 0031-249391 Tied - Chip Seal CSAH 80 (Brookston Rd. W.) to...  03/03/2016
CP 0032-153443 TST SAP 069-632-022 SAP 69-632-022, CP 0032-153443 TST -... CSAH 32 (Arrowhead Rd.) from TH 53...  05/25/2017
CP 0032-341774 SAP 069-632-023 CP 0032-341774, SAP 069-632-023-Mill & Overlay CSAH 91... 1,510' East of Haines Road to...  01/18/2018
CP 0033-374587 Tied) SAP 069-633-015 CP 0033-374587 - Sealcoating CSAH 43 (Lismore Rd.) to Bridge...  03/01/2018
CP 0035-244410 TST CP 0035-244410 TST CP 0035-244410 TST - Reclaim/Overlay & Culverts CSAH 35 (Schultz Rd.) from CSAH 4...  01/19/2017
CP 0037-290908 CP 0037-290908 (Tied) CP 0037-290908 (Tied) - Scrub Seal Glenwood to CSAH 44 (Normanna Rd.)...  03/31/2016
CP 0038-283104 TST CP 0038-283104 TST CP 0038-283104 TST (Low) - Reclaim & Overlay CSAH 44 (Pequaywan Lake Rd.) to CR...  02/11/2016
CP 0040-244394 TST CP 0040-244394 TST CP 0040-244394 TST (Tied) - Reclaim & Overlay CSAH 40 (N. Tischer Rd.) from CSAH...  02/11/2016
CP 0041-235496 SAP 069-641-004 SAP 069-641-004, CP 0041-235496 - Bridge 70 0.1 MI N of JCT CR 253 over West...  12/14/2017
CP 0043-374589 (Tied) SAP 069-643-019 CP 0043-374589 - Sealcoating CR 294 (Pioneer Road) to CSAH 4...  03/01/2018
CP 0044-153435 (Tied) SAP 069-644-028 CP 0044-153435 SAP 069-644-028 - Mill & Overlay CR272 (Briar Lake Road) to CSAH 55  02/08/2018
CP 0044-300420 TST CP 0044-300420 TST CP 0044-300420 TST (Tied) - Reclaim & Overlay 390' N. of UT 9203 to 0.85 Mi. N....  06/15/2016
CP 0044-368592 (Low Prime) CP 0044-368592 CP 0044-368592 - Bituminous Reclamation (Low) CSAH 55 to CSAH 16  02/08/2018
CP 0044-374595 (Tied) SAP 069-644-029 CP 0044-374595 - Sealcoating CSAH 34 (Howard Gnesen Road) to...  03/01/2018
CP 0044-376291 SP 069-644-030 SP 069-644-030 CP 0044-376291 - Bituminous Reclamation Camp House Road TR 6204 to CR 353  06/28/2018
CP 0045-249392 CP 0045-249392 CP 0045-249392 Tied - Chip Seal Carlton County Line to CR 284...  03/03/2016
CP 0047-241967 SAP 069-647-012 SAP 69-647-012 Tied, CP 0047-241967 - Chip Seal CSAH 47 (Swan Lake Rd.) from TH 53...  03/03/2016
CP 0048-153453 SAP 069-648-030 SAP 069-648-030, CP 0048-153452 (Tied) - Mill & Overlay CSAH 48 (2nd Ave.) from TH 2 to...  05/04/2017
CP 0048-257711 CP 0048-257711 CP 0048-257711 Tied - Chip Seal CSAH 48 (Lavaque Bypass Rd.) from...  03/03/2016
CP 0052-243859 TST SAP 069-652-017 SAP 69-652-017, CP 0052-243859 TST - Br 221 .25 Mi. W. of Jct. CSAH 7 to .15...  02/09/2017
CP 0054-204676 SAP 069-654-005 Storm WO 204676 SAP 69-654-005 - Catch Basin Repairs CSAH 54 (Piedmont Ave.) from...  08/07/2014
CP 0056-249393 CP 0056-249393 CP 0056-249393 Tied - Chip Seal CSAH 98 to CSAH 13 - CP 0056-249393  03/03/2016
CP 0059-229537 SAP 069-659-002 SAP 69-659-002, CP 0059-229537 - Bridge 388 CSAH 59 (Melrude Rd.) 0.7 Mi. West...  09/08/2016
CP 0061-292087 SAP 069-661-020 CP 0061-292087; SAP 069-661-020 - 2016 Crack Sealing CSAH 61 from 1200' Est of CSAH 33...  05/05/2016
CP 0065-255959 CP 0065-255959 TST CP 0065-255959 TST (Tied) - Reclaim & Overlay CSAH 65 from CSAH 5 to Dean Rd -...  12/15/2016
CP 0065-365151 (Tied) SAP 069-665-006 CP 0065-365151 (Tied), SAP 069-665-006 - Sealcoating CSAH 5 South to CSAH 5 No. Jct.  03/01/2018
CP 0066-363849 (Tied) CP 0066-363849 (Tied) CP 0066-363849 (Tied) - Storm Sewer & Culvert... TH 73 to 0.5 miles east  03/29/2018
CP 0068-280500 SAP 069-668-006 SAP 69-668-006, CP 0068-280500 (Tied) - Chip Seal CSAH 106 to CR 303 - CP...  02/04/2016
CP 0068-298686 (Low Prime) CP 0068-298686 (Low Prime) CP 0068-298686 (Low Prime) TST - Reclaim & Overlay CSAH 68 from TH 169 to CSAH 21 -...  11/30/2017
CP 0068-304825 TST CP 0068-304825 TST CP 0068-304825 TST (tied); CP 0026-304816 (Low) -... TH 169 to CSAH 21 - CP 0068-304825...  02/09/2017
CP 0070-304817 SAP 069-670-009 CP 0070-304817, SAP 069-670-009 - Culvert Replacement CSAH 21 to SLC/Lake County Line  01/04/2018
CP 0073-249394 CP 0073-249394 CP 0073-249394 Tied - Chip Seal CSAH 13 (Midway Rd.) to CSAH 45...  03/03/2016
CP 0073-276911 (Tied) SAP 069-673-005 SAP 069-673-005 CP 0073-276911 - Reclaim & Overlay CSAH 73 (Eldes Rd.) from Carlton...  03/08/2018
CP 0074-280501 CP 0074-280501 CP 0074-280501 (Tied) - Chip Seal CR 472 to TH 53 - CP 0074-280501...  02/04/2016
CP 0077-365159 (Tied) SAP 069-677-010 CP 0077-365159 (Tied), SAP 069-677-010 - Sealcoating TH 169 to CR 929  03/01/2018
CP 0080-263813 TST (Low Prime) CP 0080-263813 TST (Low Prime) CP 0080-263813 TST (Low Prime)- Reclaim & Overlay CSAH 80 (Brookston Rd.) from CSAH...  02/23/2017
CP 0082-215031 SAP 069-682-003 SAP 69-682-003, CP 0082-215031 TST, Bridge #645 0.6 mi E of Jct TH 73 over Gilmore...  11/19/2015
CP 0087-287163 CP 0087-287163 (Tied) CP 0087-287163 (Tied) - Scrub Seal TH 53 to CR 478 - CP 0087-287163...  03/31/2016
CP 0089-374601 (Tied) SAP 069-689-012 CP 0089-374601 - Sealcoating 594' N. of Skyline Parkway to CSAH...  03/01/2018
CP 0090-257713 TST CP 0090-257713 TST Tied CP 0090-257713 TST - Sidewalk Construction CSAH 90 (Arlington Ave.) from TH...  05/25/2017
CP 0090-8203 TST SP 069-690-013 SP 69-690-013, CP 0090-8203 TST - Reclaim, Mill,... CSAH 90 (Arlington Rd.) from STH...  06/18/2015
CP 0091-304809 CP 0091-304809 (Tied) CP 0091-304809 (Tied) - Scrub Seal CSAH 32 (Arrowhead Rd.) to Airport...  03/31/2016
CP 0091-342006 CP 0091-342006 CP 0091-342006-Int. of CSAH 91 and Mall Dr./Market St. CSAH 91, Haines Rd, Mun. 0118, D5,...  06/29/2017
CP 0097-280502 CP 0097-280502 CP 0097-280502 (Tied) - Chip Seal TH 37 to CSAH 96 - CP 0097-280502...  02/04/2016
CP 0097-340081 (Low) SAP 069-697-007 CP 0097-340081 (Low), SAP 069-697-007 - Culvert... CSAH 20 to CSAH 4  01/11/2018
CP 0098-290909 CP 0098-290909 (Tied) CP 0098-290909 (Tied) - Scrub Seal TH 194 to CSAH 7 (Industrial Rd.)...  03/31/2016
CP 0099-287573 SAP 069-699-002 SAP 069-699-002, CP 0099-287573 - Bridge 460 (tied) CSAH 16 to .1 Mi. North of CSAH 16...  03/16/2017
CP 0099-287574 SAP 069-699-001 SAP 069-699-001, CP 0099-287574 - Bridge 467 (tied) 0.1 Mi. South of CR 650 over...  03/16/2017
CP 0099-340082 (Tied) SAP 069-699-004 CP 0099-340082 (Tied), SAP 069-699-004 - Culvert... CSAH 16 to CSAH 100  01/11/2018
CP 0100-367289 CP 0100-367289 CP 0100-367289 Culvert Replacement 600' north of CSAH 130  06/21/2018
CP 0101-261099 SP 069-701-005 SP 069-701-005, CP 0101-261099 TST - Mill, Reclaim,... CSAH 101 (Fayal Rd.) from CSAH 7...  04/27/2017
CP 0101-287164 CP 0101-287164 (Tied) CP 0101-287164 (Tied) - Scrub Seal CR 955 to CSAH 7 - CP 0101-287164...  03/31/2016
CP 0103-352324 (Tied) SAP 069-703-016 CP 0103-352324 (Tied), SAP 069-703-016 CSAH 102 to TH... CSAH 102 to TH 169-CSAH 103, Mud...  03/29/2018
CP 0104-365169 (Tied) SAP 069-704-005 CP 0104-365169 (Tied), SAP 069-704-005 - Sealcoating CSAH 77 to end of Bituminous  03/01/2018
CP 0110-153277 TST SP 069-710-026 SP 069-710-026, CP 0110-153277 TST - Hot In Place... CSAH 16 to Hoyt Lakes City Limits...  03/16/2017
CP 0111-352326 (Tied) SAP 069-711-002 CP 0111-352326 (Tied), SAP 069-711-002 - Culvert... CSAH 4 to CSAH 99-CSAH 111, Palo...  01/11/2018
CP 0116-243925 TST CP 0116-243925 TST CP 0116-243925 TST - Br 367 2.45 Mi. E. of Jct. CSAH 24 to...  05/19/2016
CP 0122-216092 (Low) SAP 069-722-008 CP 0122-216092 (Low), SAP 069-722-008 Reclaim & Overlay CSAH 122 (Gamma Rd.) from TH 53 to...  03/02/2017
CP 0123-216096 (Tied) SAP 069-723-007 CP 0123-216096 (Tied), SAP 069-723-007 Reclaim &... CSAH 123 (Gappa Rd.) from CSAH 122...  03/02/2017
CP 0129-216097 (Tied) SAP 069-729-006 CP 0129-216097 (Tied), SAP 069-729-006 Bituminous... CSAH 129 (Ash River Trail) from TH...  03/02/2017
CP 0133-289400 TST CP 0133-289400 TST (Tied) CP 0133-289400 TST (Tied) - Reclaim & Overlay Itasca County Line to TH 73 - CP...  06/02/2016
CP 0133-398702 CP 0133-398702 (Low) CP 0133-398702 (Low) - Mill & Overlay, Curb & Gutter Western Avenue to 200' West of...  07/12/2018
CP 0136-287483 SAP 069-736-001 SAP 69-736-001, CP 0136-287483 - Roundabout Intersection of new CSAH 5 & TH 73  03/23/2017
CP 0136-298567 CP 0136-298567 CP 0136-298567 - Traffic Signals Intersection CSAH 136 and MN TH 73...  06/23/2016
CP 0137-317611, SAP 069-737-003 SAP 069-737-003 CP 0137-317611, SAP 069-737-003 (BR 550) Bridge 550 located on CSAH 137 and...  05/24/2018
CP 0180-213069 CP 0180-213069 TST CP 0180-213069 TST, Bridge #867 CR 180 between TH 53 and Blackduck...  11/19/2015
CP 0180-259391 CP 0180-259391 CP 0180-259391, Bridge 347 BR 347 located on CR 180 over...  02/08/2018
CP 0185-243860 TST CP 0185-243860 TST CP 0185-243860 TST (Bridge 261) .85 Mi. North of Jct. CR 817 to...  01/07/2016
CP 0189-243857 TST CP 0189-243857 TST CP 0189-243857 TST - Bridge 209 1.05 Mi. East of Jct. TH 73 to...  02/23/2017
CP 0196-243856 TST CP 0196-243856 TST CP 0196-243856 TST - Bridge 197 .95 Mi. South of Jct. CSAH 133 to...  02/04/2016
CP 0209-243855 TST CP 0209-243855 TST CP 0209-243855 TST - Bridge 194 .65 Mi. North of Jct. CSAH 133 to...  11/17/2016
CP 0223-244397 TST CP 0223-244397 TST (Low) CP 0223-244397 TST (Low) - Reclaim & Overlay/Culverts CR 223 (Munger Shaw Rd.) from CR...  05/05/2016
CP 0223-305077 CP 0223-305077 CP 0223-305077 - Concrete Box Culvert 0.57 Mi. South of Hwy 53 - CP...  01/19/2017
CP 0254-244395 TST CP 0254-244395 TST CP 0254-244395 TST (Tied) - Reclaim & Overlay CR 254 (N. Tischer Rd.) from CSAH...  02/11/2016
CP 0259-153437 TST CP 0259-153437 TST CP 0259-153437 TST (Tied) - Reclaim & Overlay CR 259 (W. Beyer Rd.) from CSAH 4...  01/07/2016
CP 0261-378873 (Tied) CP 0261-378873 CP 0261-378873 - Bituminous Reclamation Carlton County Line to CSAH 73  03/08/2018
CP 0266-317609 CP 0266-317609 CP 0266-317609, Br 65 located on CR 266 BR 65 located on CR 266 (Fox Farm...  03/22/2018
CP 0274-273921 CP 0274-273921 CP 0274-273921 Tied, Reclamation, Bit. Seal Coat CR 274 (Thompson Lake Rd.) from...  10/22/2015
CP 0280-153456 TST CP 0280-153456 TST CP 0280-153456 TST (Tied) - Reclaim & Overlay CR 289 (Woodland Ave.) to CR 245...  01/07/2016
CP 0284-295016 TST CP 0284-295016 TST CP 0284-295016 TST (Tied) - Reclaim & Overlay Lavaque Bypass (CSAH 48) to Martin...  05/05/2016
CP 0289-153458 TST CP 0289-153458 TST CP 0289-153458 TST (Tied) - Reclaim & Overlay CSAH 10 (Martin Rd) to CSAH 2...  01/07/2016
CP 0290-279351 CP 0290-279351 CP 0290-279351 - Bituminous Overlay Duluth City Limits to McQuade Rd....  01/18/2018
CP 0296-319589 CP 0296-319589 CP 0296-319589 Culverts-400' North of Airbase Rd to... CR 296, Airport Approach Rd, Mun....  05/25/2017
CP 0297-284942 TST CP 0297-284942 TST (Tied) CP 0297-284942 TST (Tied) - Reclaim & Overlay South Termini to CSAH 48 (Lavaque...  05/05/2016
CP 0303-328289 TST (Low Prime) CP 0303-328289 TST (Low Prime) CP 0303-328289 TST (Low Prime), Bridge Railing... 4 Bridges on Various County...  10/19/2017
CP 0329-281201 CP 0329-281201 CP 0329-281201 (Tied) - Chip Seal TH 37 to CR 776 - CP 0329-281201...  02/04/2016
CP 0332-257646 CP 0332-257646 (tied) CP 0332-257646 GRIP (tied) CR 332 (Northern Lights Rd.) from...  03/02/2017
CP 0341-352327 (Tied) CP 0341-352327 (Tied) CP 0341-352327 (Tied) - Culvert Replacement End of Bituminous to TWP 6528-CR...  01/11/2018
CP 0375-259415 Br 514 (Low) CP 0375-259415 (low) CP 0375-259415 (Low) Br 514 0.5 miles South of CSAH 21 on CR...  11/30/2017
CP 0383-281189 CP 0383-281189 CP 0383-281189 (Tied) - Chip Seal CR 329 to End of Pavement - CP...  02/04/2016
CP 0393-298690 (Tied) CP 0393-298690 (Tied) CP 0393-298690 (Tied) - Culvert Replacement 0.3 Mi. West of CSAH 20 - CP...  01/11/2018
CP 0395-255958 CP 0395-255958 CP 0395-255958 (Tied) - Reclaim & Overlay CR 395 from CSAH 5 to Dean Rd. -...  12/15/2016
CP 0411-153311 (Tied) CP 0411-153311 (Tied) CP 0411-153311 (Tied) - Mill & Overlay CR 411 (Wiseman Rd.) from CSAH 26...  02/15/2018
CP 0421-312073 (Tied) CP 0421-312073 (Tied) CP 0421-312073 (Tied) Br 299 CR 421, Sassass Rd., D4, P3, TH 1...  11/30/2017
CP 0431-213066 CP 0431-213066 TST CP 0431-213066 TST - Bridge #323 CR 431 (Short Rd.) between CR 948...  07/09/2015
CP 0442-215028 CP 0442-215028 TST CP 0442-215028 TST, Bridge #883 0.2 mi w of Jct CR 444 over East...  02/11/2016
CP 0481-271724 (Low) CP 0481-271724 (Low) CP 0481-271724 (Low) - Bridge 774 BR 774 located on CR 481, CP...  04/19/2018
CP 0483-276897 CP 0483-276897 CP 0483-276897 (Tied) - Reclaim & Overlay CR 982 (Old Miller Trunk) to CR...  11/19/2015
CP 0488-190852 CP 0488-190852 TST CP 0488-190852 TST - Bridge #656 CR 488 .3 Mi. North of Jct. TH 533...  10/22/2015
CP 0491-271722 (Tied) CP 0491-271722 (Tied) CP 0491-271722 (Tied) - Bridge 646 BR 646 located on CR 491, CP...  04/19/2018
CP 0492-213057 CP 0492-213057 TST CP 0492-213057 TST - Bridge 303 CR 492 (Anton Rd.) from CR 912...  07/09/2015
CP 0523-216098 (Tied) CP 0523-216098 CP 0523-216098 (Tied), Reclaim & Overlay CR 523 (Burma Rd.) from CSAH 123...  03/02/2017
CP 0523-243941 CP 0523-243941 CP 0523-243941 (Br 823) CR 523 (Burma Rd.) .25 Mi. NE of...  03/30/2017
CP 0526-298689 (Tied) CP 0526-298689 (Tied) CP 0526-298689 (Tied) - Reclaim & Overlay TH 169 to TH 169 - CP 0526-298689...  02/15/2018
CP 0540-243937 TST CP 0540-243937 TST CP 0540-243937 TST (Bridge 705) .45 Mi. West of Jct. CR 937 to .35...  12/10/2015
CP 0547-375668 (Low Prime) CP 0547-375668 (Low Prime) CP 0547-375668 - (Low Prime) From UT 9230 E. 11.40 Miles to...  01/25/2018
CP 0588-295995 CP 0588-295995 TST (Tied) CP 0588-295995 TST (Tied) - Reclaim & Overlay CR 588 from 800 W of County Line...  12/15/2016
CP 0594-281187 CP 0594-281187 CP 0594-281187 (Tied) - Chip Seal TH 37 to End of Pavement - CP...  02/04/2016
CP 0597-243861 TST CP 0597-243861 TST CP 0597-243861 TST (Low) - Bridge 355 .25 Mi. North of Jct. CR 936 to...  04/14/2016
CP 0611-213067 CP 0611-213067 TST CP 0611-213067 TST, Bridge #783 CR 611 (Hopper Rd.) between Stone...  10/01/2015
CP 0642-243938 TST CP 0642-243938 TST CP 0642-243938 TST - Bridge 773 .65 Mi. East of Jct. CSAH 5 to .75...  11/03/2016
CP 0672-257647 CP 0672-257647 (tied) CP 0672-257647 GRIP (tied) CR 672 (Salmi Rd.) from CSAH 122...  03/02/2017
CP 0673-216099 (Tied) CP 0673-216099 CP 0673-216099 (Tied), Reclaim & Overlay CR 673 (Gamma Rd.) from CSAH 122...  03/02/2017
CP 0673-333644 (tied) CP 0673-333644 CP 0673-333644 (tied), GRIP CR 673 (Gamma Rd.) from CSAH 122...  03/02/2017
CP 0675-244408 TST CP 0675-244408 TST CP 0675-244408 TST (Tied) - Reclaim/Overlay & Culverts CR 675 (Arnold Rd.) from CSAH 43...  02/11/2016
CP 0694-263697 TST (Low Prime) CP 0694-263697 TST CP 0694-263697 TST - Reclaim & Overlay CR 694 (Seville Rd.) from CSAH 46...  04/06/2017
CP 0695-257650 CP 0695-257650 (tied) CP 0695-257650 GRIP (tied) CR 695 (Ness Rd.) from CSAH 122 to...  03/02/2017
CP 0696-185317 SAP 069-598-054 SAP 69-598-054, CP 0696-185317 BR 123 on CR 696 BR 123 on CR 697 0.65 Mi. W. of...  12/04/2014
CP 0708-287165 CP 0708-287165 (Tied) CP 0708-287165 (Tied) - Scrub Seal TH 169 to CR 661 - CP 0708-287165...  03/31/2016
CP 0753-257708 TST CP 0753-257708 TST CP 0753-257708 TST (Tied) - Reclaim & Overlay CR 753 from CR 473 to .25 Mi. N....  12/15/2016
CP 0753-257710 CP 0753-257710 TST CP 0753-257710 TST (Tied) - Reclaim & Overlay CR 753 between Itasca County Line...  12/15/2016
CP 0769-229625 CP 0769-229625 TST CP 0769-229625 TST, Bridge 709 CR 769 (Willow River JCT RD) from...  10/06/2016
CP 0776-281205 CP 0776-281205 CP 0776-281205 (Tied) - Chip Seal CSAH 7 to CR 329 - CP 0776-281205...  02/04/2016
CP 0779-243926 TST CP 0779-243926 TST CP 0779-243926 TST (Tied) - Bridge 369 .15 Mi. West of Jct. CR 597 to .05...  04/14/2016
CP 0837-299737 TST CP 0837-299737 TST CP 0837-299737 TST - Reclaim & Overlay CR 832 to CR 186 - CP 0837-299737...  06/02/2016
CP 0889-241305 CP 0889-241305 CP 0889-241305 Tied - Reclaim & Overlay (TST) CR 889 (Solway Rd.) from CSAH 6...  05/14/2015
CP 0890-241304 CP 0890-241304 CP 0890-241304 Tied - Reclaim & Overlay (TST) CR 859 (Caribou Lake Rd.) to CR...  05/14/2015
CP 0894-277234 (Tied) CP 0894-277234 CP 0894-277234 - Bituminous Reclamation Carlton County Line to CSAH 13...  03/08/2018
CP 0897-276912 TST CP 0897-276912 TST (Tied) CP 0897-276912 TST (Tied) - Reclaim & Overlay CR 897 (Ratika Rd.) from CR 889...  05/05/2016
CP 0898-249395 CP 0898-249395 CP 0898-249395 Tied - Chip Seal CSAH 73 (Old Hwy 61) to CSAH 19...  03/03/2016
CP 0910-287166 CP 0910-287166 (Tied) CP 0910-287166 (Tied) - Scrub Seal CSAH 24 to CSAH 78 - CP...  03/31/2016
CP 0916-243933 TST CP 0916-243933 TST CP 0916-243933 TST (Bridge 650) .25 Mi. North of Jct. CSAH 22 to...  02/04/2016
CP 0921-281207 CP 0921-281207 CP 0921-281207 (Tied) - Chip Seal TH 135 to TH 135 - CP 0921-281207...  02/04/2016
CP 0936-213059 CP 0936-213059 TST CP 0936-213059 TST (Tied) - Bridge #305 CR 936 (W. Hannula Rd.) between CR...  04/14/2016
CP 0937-243934 TST CP 0937-243934 TST CP 0937-243934 TST - Bridge 655 .25 Mi. South of Jct. CR 540 to...  07/21/2016
CP 0938-235515 TST CP 0938-235515 TST CP 0938-235515 TST - Bridge 657 .6 miles N. of Jct. TH1 on CR 938...  01/26/2017
CP 0965-128462 CP 0965-128462 CP 0965-128462, BR 587 CR 965 (Hingeley Rd.) from .45 Mi....  03/17/2016
CP 0982-248043 TST CP 0982-248043 TST CP 0982-248043 TST - Mill & Overlay CR 982 (Old Hwy 53) from CSAH 15...  11/19/2015
CP 0999-216100 CP 0999-216100 CP 0999-216100 Tied (TST), Reclaim & Overlay CR 999 (N. Pike Lake Rd.) from...  05/14/2015
CP 176330 SAP 069-710-025 SAP 69-710-025 Br 488 Reconstruction 0.7 Mi. W of CR 633  12/03/2015
CP 63797 SAP 069-616-049 SAP 69-616-049(Low) Reclaim & Overlay TST CSAH 4 to 1.84 mi W of NFS 118 -...  05/07/2015
CP 8103-281204 CP 8103-281204 CP 8103-281204 (Tied) - Chip Seal CSAH 65 to End of Pavement - CP...  02/04/2016
CP 8121-247641 SAP 069-599-040 SAP 69-599-040 TST, CP 8121-247641 (Tied) - Bridge 344 UT 8121 (County Rd. 422) between...  04/28/2016
CP 8128-235517 SAP 069-599-041 CP 8128-235517, SAP 069-599-041 - Bridge 726 UT 8128 between CSAH 5 and CR 134  01/12/2017
CP 8131-296650 CP 8131-296650 (Tied) CP 8131-296650 (Tied) - Reclaim & Overlay UT 8131 from CR 134 to Dewey Point...  12/15/2016
CP 8146-271566 SAP 069-599-043 CP 8146-271566 SAP 069-599-043 - Bridge 818 0.5 Mi. South of TH 53 and East of...  01/25/2018
CP 8169-281193 CP 8169-281193 CP 8169-281193 (Tied) - Chip Seal CSAH 68 to End of Pavement - CP...  02/04/2016
CP 8181-281206 CP 8181-281206 CP 8181-281206 (Tied) - Chip Seal UT 8169 to End - CP 8181-281206...  02/04/2016
CP 8188-281188 CP 8188-281188 CP 8188-281188 (Tied) - Chip Seal UT 8116 to UT 8116 - CP...  02/04/2016
CP 9215-271719 TST CP 9215-271719 TST (tied) CP 9215-271719 TST - Bridge 411 (tied) .6 Mi. South of CSAH 16 - CP...  03/16/2017
CP 9220-153305 CP 9220-153305 CP 9220-153305 (Tied), Reclaim & Overlay UT 9220 from CSAH 4 to UT 9231 -...  05/07/2015
CP 9230-271723 TST SAP 069-599-042 CP 9230-271723 TST, SAP 069-599-042 - Bridge 755 (low) 12.6 miles East of Cotton over...  03/16/2017
CP 94576 SAP 069-614-016 SAP 69-614-016(Low) TST Cold In Place Recycle Midway Township  11/19/2015
CP_0000-375664 (Tied) SAP 009-673-001 CP 0000-375664 - Bituminous Reclamation Carlton County East Highway 61 to...  03/08/2018
SAP 069-652-019, CP 0052-300237 (Tied) SAP 069-652-019 SAP 069-652-019, CP 0052-300237 (Tied), Br 216 CSAH 52, Arkola Rd, D6, P3, CSAH 7...  03/01/2018
SAP 069-700-016, CP 0100-313756 (Low) SAP 069-700-016 SAP 069-700-016, CP 0100-313756 (Low) - Br 489 1.7 Mi. South of the City of...  03/01/2018
SAP 69-688-009 SAP 069-688-009 SAP 069-688-009, CP 0088-9577 Bridge 336 ELY, MN  12/15/2016
SP 69-090-018 SP 069-090-018 SP 69-090-018 CP 0000-3623, Mesabi Trail McKinley -... McKinley to Biwabik  12/11/2014
SP 69-090-021 SP 69-090-021 SP 69-090-021 Mesabi Trail Soudan to Tower, CP... East of Tower, MN, CP 0000-3636  10/31/2013
SP 69-691-020 SP 069-691-020 SP 69-691-020(Low) SP 69-691-027, 8th to Morris Thomas... Duluth, MN CP 0091-8269 (FILE IN...  11/29/2012
Storm WO 161489A Storm WO 161489A Storm WO 161489A--CSAH 48 Storm Sewer System Cleaning CSAH 48 From CSAH 6 to US Hwy 2  09/26/2012
STORM WO 176509 SAP 069-689-004 Storm WO 176509 SAP 69-689-004 (Low) complete rebuild Duluth, MN  03/20/2014

Construction Status

CP 0000-187070 Roadwork: SP 69-070-018 Striping 2016 - Various Locations Estimated End Date: 10/04/2017
all work completed
CP 0000-187078 Roadwork: SAP 69-030-029 Striping 2015 - Various CSAH's Estimated End Date: 10/30/2015
Project Completed waiting for finalized final payment.
CP 0000-204369 Roadwork: SP 69-597-007, CP 0000-204369 - Bridge 48 - South of Int. Pine and 2nd St. in - CP 0000-204369 Estimated End Date: 09/30/2017
complete
CP 0000-205954 (Parent WO) Roadwork: SAP 69-030-034, CP 0000-205954 - 2014 Pike Lake Micro Surface - CSAH3, CSAH 6, CSAH 13, CSAH 48, CSAH 56, CSAH 98 - CP 0000-205954, SAP 069-030-034 (Parent WO) Estimated End Date: 08/23/2014
Project has been completed.
CP 0000-213215 Roadwork: SP 69-090-030, CP 0000-213215 - Ped/Bike Trail - CSAH 128 to Camp Lake Rd. - CP 0000-213215, SP 069-090-030 Estimated End Date: 11/10/2017
Not started
CP 0000-215963 Roadwork: SAP 69-600-044, CP 0000-215963 - Reconstruction - Rice Lk Dam Rd. between CSAH 4 (Rice Lake Rd.) and CR 849 (McComber Rd.) - CP 2903-215963, SAP 069-600-044 Estimated End Date: 06/30/2017
Not started
CP 0000-225072 Roadwork: SP 69-070-020, CP 0000-225072 - Striping - Various County Highways - CP 0000-225072 Estimated End Date: 08/26/2018
All Phase 2 striping has been completed. Now in closeout phase.
CP 0000-259422 TST Roadwork: SP 69-070-025, CP 0000-259422 TST - Red Light Enforcement Lights - 13 Traffic Signals in Duluth & Hermantown - CP 0000-259422 TST Estimated End Date: 09/08/2017
Work Completed. In Closeout Process.
CP 0000-259423 TST Roadwork: SP 069-070-027, CP 0000-259423 - 6" Paint Edgeline Striping - Various County Highways - CP 0000-259423 Estimated End Date: 07/27/2018
Not started
CP 0000-259425 TST Roadwork: SP 088-070-049/SP 069-070-026, CP 0000-259425 TST - Rural Intersection Lighting consisting of SP 069-070-026 (SLC), SP 009-070-005 (Carlton Co.), 031-070-005 (Itasca Co.) - Intersections in Carlton, Itasca and St. Louis Counties - CP 0000-259425 TST Estimated End Date: 08/03/2018
Construction Completed
CP 0000-259426 Roadwork: CP 0000-259426 SP 088-070-050 - Mainline Dynamic Warning Systems - Mainline Dynamic Warning System in Carlton, Itasca and St. Louis Counties Estimated End Date: 11/30/2018
In Construction Phase
CP 0000-259567 SAP 069-597-008 Br 747 Roadwork: CP 0000-259567, SAP 069-597-008 Br 747 Cook - River Street, City Of Cook D4, P1, CSAH 24 to CSAH 115 Estimated End Date: 11/09/2018
Closed for construction until Dec 2018.
CP 0000-275366 Roadwork: CP 0000-275366 - 2017 Maintenance Striping - Various County Highways - CP 0000-275366 Estimated End Date: 10/25/2017
Not started
CP 0000-275367 Roadwork: CP 0000-275367 - 2018 Maintenance Striping - Various County Highways - CP 0000-275367 Estimated End Date: 08/17/2018
Not started
CP 0000-275389 Roadwork: SAP 69-030-038, CP 0000-275389 - 2017 Epoxy Wet Reflective Striping - Various County State Aid Highways - CP 0000-275389, SAP 069-030-038 Estimated End Date: 06/15/2018
Not started
CP 0000-275390 Roadwork: SAP 69-030-039, CP 0000-275390 Pavement Markings - Various County State Aid Highways - CP 0000-275390, SAP 069-030-039 Estimated End Date: 08/03/2018
Not started
CP 0000-277015 (Low) Roadwork: CP 0000-277015 - 2016 Crack Sealing - Various Roads within St. Louis County - CP 0000-277015 Estimated End Date: 08/26/2016
Not started
CP 0000-278659 Roadwork: CP 0000-278659 South Crushing 2017 - Four gravel pits in Southern St. Louis County Estimated End Date: 10/06/2017
Not started
CP 0000-278668 Roadwork: CP 0000-278668 - North Crushing 2018 - North St. Louis County Estimated End Date: 10/05/2018
Not started
CP 0000-278669 Roadwork: CP 0000-278669 -South Crushing 2018 - South St. Louis County Estimated End Date: 10/05/2018
Not started
CP 0000-278670 Roadwork: 2018 Crack Sealing - Various CSAH and Local Roads within St. Louis County Estimated End Date: 08/23/2018
Project Complete
CP 0000-286249 Roadwork: SAP 009-606-033, CP 0000-286249 - Carlton County Chip Seal - CSAH 6 From TH 73 to 516' West of CSAH 61 - CP 0000-286249 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0000-286250 Roadwork: SAP 009-661-027, CP 0000-286250 - Carlton County Chip Seal - CSAH 61 From Sounty County Line to TH 210 - CP 0000-286250 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0000-286251 Roadwork: CP 0000-286251: TLT 2016-1, TLT 2016-2, TLT 2016-3 - Carlton County Chip Seal - Carlton County - CP 0000-286251 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0000-293124 Roadwork: SP 069-070-030, CP 0000-293124 - Centerline Rumble Strips and Pavement Markings - Various County Highways - CP 0000-293124 Estimated End Date: 08/31/2018
Not started
CP 0000-293136 Roadwork: SP 069-070-034, CP 0000-293136 - 6" Solid Line Epoxy Ground In (Wet Reflective) - Various County Highways - CP 0000-293136 Estimated End Date: 07/27/2018
Not started
CP 0000-305083 Roadwork: SAP 069-600-045, CP 0000-305083 - Complete Reconstruction - Commonwealth Ave. between Prescott St. and Hudson Blvd. - CP 0000-305083 Estimated End Date: 09/21/2018
Not started.
CP 0000-322853 (Prime) Roadwork: CP 0000-322853 (Prime) - Scrub Seal 2017 consisting of 61 projects - Various Roads in St. Louis County Estimated End Date: 09/08/2017
Not started
CP 0000-323208 (Prime) Roadwork: CP 0000-323208 (Prime)-Chip Seals-Various Roads in St. Louis County - Various Roads in St. Louis County Estimated End Date: 09/08/2017
Not started
CP 0000-326330 Roadwork: CP 0000-326330 Itasca Co Project 2017-07 CR 753 - Itasca County CR 527 to 800' W of County Line Estimated End Date: 09/08/2017
Project Complete
CP 0000-365576 (TIED) Roadwork: CP 0000-365576 (TIED) - Meadowlands - Western Avenue from Spruce Street to 400' N. of Spruce Street Estimated End Date: 10/12/2018
Not started
CP 0000-371260 (Prime)(Low) Roadwork: CP 0000-371260 - Sealcoating - Southern St. Louis County Estimated End Date: 09/07/2018
Not started.
CP 0000-375440 (Prime) (Low) Roadwork: CP 0000-375440 (Prime) (Low) - Scrub Seal - Northern St. Louis County Estimated End Date: 09/07/2018
Project Complete
CP 0000-375441 (Prime) Roadwork: CP 0000-375441 (Prime) Chip Seal North 2018 - Northern St. Louis County Estimated End Date: 09/07/2018
Project Complete
CP 0000-388268 (Low), SAP 069-596-011 Roadwork: CP 0000-388268 (Low), SAP 069-596-011 - Complete Reconstruction - US Highway 2 to Boundary Ave. Estimated End Date: 11/15/2018
Not Started
CP 0000-388269 Roadwork: CP 0000-388269 - Complete Reconstruction - Ugstad Road to 8th Avenue Estimated End Date: 11/15/2018
Not started
CP 0000-388270 Roadwork: CP 0000-388270 - Complete Reconstruction - Almac Drive to 1st Street Estimated End Date: 11/15/2018
Not started.
CP 0002-244409 TST Roadwork: CP 0002-244409 TST (Low) - Reclaim/Overlay & Culverts - CSAH 2 (W. Tischer Rd.) from CSAH 4 (Rice Lake Rd.) to CSAH 34 - CP 0002-244409 TST (Low) Estimated End Date: 10/28/2016
Culvert Replacement Started
CP 0002-261283 Roadwork: CP 0002-261283 TST (Tied) - Reclaim & Overlay - CSAH 2 (W. Tischer Rd.) from CSAH 34 (Howard Gnesen Rd.) to Eagle Lake Rd. - CP 0002-261283 TST (Tied) Estimated End Date: 10/28/2016
Culvert Replacement Started
CP 0003-216102 (Low Prime) Roadwork: CP 0003-216102, Reclaim & Overlay - CSAH 3 (Becks Rd.) from Carlton County Line to CSAH 13 (Midway Rd.), CP 0003-216102 Estimated End Date: 08/10/2018
Not started
CP 0003-244396 (Low) Roadwork: SAP 069-603-015(Low) CP 0003-244396 - Reclaim & Overlay - CSAH 3 (Becks Rd.) from TH 23 to 600' SE of 123rd Ave. W. - CP 0003-244396 TST Estimated End Date: 08/09/2019
Not started.
CP 0004-136147 Roadwork: SP 69-604-073 TST, CP 0004-136147 - Sidewalk - CSAH 4 (Rice Lake Road) from Central Entrance to Arrowhead Road - CP 0004-136147 Estimated End Date: 10/07/2016
Construction Started
CP 0004-213068 Roadwork: SAP 69-604-076, CP 0004-213068 - Bridge #414 - CR 4 (Vermilion Trail) between CR 547 (Brimson Rd.) and CSAH 16 (Townline Rd.), CP 0004-213068, SAP 069-604-076 Estimated End Date: 11/06/2015
Complete
CP 0004-216101 Roadwork: SAP 69-604-077(Low), CP 0004-216101 (TST), Reclaim & Overlay - CSAH 4 (Vermilion Trail) from CR 274 (Thompson Lake Rd.) to CSAH 49 (Three Lakes Rd.), CP 0004-216101 Estimated End Date: 09/02/2016
Reclaimed, bituminous surfacing starting 7/18/2016
CP 0004-226569 Roadwork: SAP 69-604-075, CP 0004-226569 TST (Low) - Traffic Signals - Intersection of Rice Lake Rd. and Airport Rd. - CP 0004-226569 TST (Low) Estimated End Date: 10/14/2016
Not started
CP 0004-252401 TST Roadwork: CP 0004-252401 TST (Tied) - Bypass Lane - CSAH 4 (Rice Lake Rd.) intersection w/ Airpark Blvd. - CP 0004-252401 TST (Tied) Estimated End Date: 10/07/2016
Not started
CP 0005-204368 Roadwork: SP 69-605-044, CP 0005-204368 - Bridge 698 - CSAH 5 between CR 962 and CR 501 - CP 0005-204368 Estimated End Date: 06/29/2018
Complete
CP 0005-211976 Roadwork: SAP 69-605-045, CP 0005-211976 (Low) - 2016 Chip Seal: TH 37 to CSAH 92 - CSAH 5 (Hwy 5) from TH 37 to CSAH 92 - CP 0005-211976 (Low) Estimated End Date: 09/02/2016
Not started
CP 0005-255874 (Low) Roadwork: CP 0005-255874 (Low); SAP 069-605-047, CSAH 22 to TH 1 - Reclaim & Overlay - CSAH 5 (Hwy 5) from CSAH 22 (Hwy 22) to TH 1 - CP 0005-255874 (Low) Estimated End Date: 08/15/2018
Project Complete
CP 0005-255876 Roadwork: SAP 069-605-046, CP 0005-255876 - Culvert Replacement - CSAH 5 (Hwy 5) from CSAH 22 (Hwy 22) to .15 Mi. North of TH 1 - CP 0005-255876 Estimated End Date: 07/14/2017
Project Complete
CP 0005-257590 TST Roadwork: CP 0005-257590 TST (Low) - Reclaim & Overlay - CSAH 5 from Side Lake to Snake Trail - CP 0005-257590 TST (Low) Estimated End Date: 09/08/2017
Project Complete
CP 0005-287158 (Low) Roadwork: CP 0005-287158 (Low) - Scrub Seal - CSAH 84 to CSAH 81 - CP 0005-287158 (Low) Estimated End Date: 09/12/2016
Not started
CP 0005-289397 Roadwork: CP 0005-289397 (Tied) Culvert Replacement - 150' South of CR 743 to 950' South of CR 750 - CP 0005-289397 (Tied) Estimated End Date: 08/11/2017
Not started
CP 0006-356728 Roadwork: SAP 069-606-026, CP 0006-356728 Traffic Signal Systems Revisions - Various Intersections on CSAH 6, CSAH 6, Maple Grove, Mun. 0202, D5, P1, CSAH 13 (Midway Rd) to CSAH 91 (Haines Rd) Estimated End Date: 08/31/2018
Not started
CP 0006-374585 (Tied) Roadwork: CP 0006-374585 - Sealcoating - TH 2 to CSAH 13 (Midway Road) Estimated End Date: 09/07/2018
Not started.
CP 0007-208919 Roadwork: SP 69-607-050, CP 0007-208919 - Reclaim & Overlay - CSAH 7 from W. Jct. CSAH 47 to CSAH 133 - CP 0007-208919, SP 069-607-050 Estimated End Date: 08/01/2018
Not started
CP 0007-241426 Roadwork: SAP 69-607-051(Low), CP 0007-241426 - Chip Seal - CSAH 7 (Industrial Rd.) from TH 53 to W. Jct. CSAH 47 - CP 0007-241426, SAP 069-607-051 Estimated End Date: 09/02/2016
Not started
CP 0009-147349 Roadwork: SP 69-609-040, CP 0009-147349 TST - Reconstruction - CSAH 9 (4th St./Wallace Ave.) from 6th Ave E to Arrowhead Rd., CP 0009-147349 TST Estimated End Date: 11/30/2017
Almost done
CP 0009-241306 (TST) Roadwork: CP 0009-241306(Low) (TST) - Reclaim & Overlay - CR 9 (N. Pike Lake Rd.) from Helm Rd. to Pike Lane - CP 0009-241306 Estimated End Date: 08/10/2016
Construction of Main Roadway complete for season on Saturday October 17, 2015
CP 0010-295530 Roadwork: CP 0010-295530 - Culvert Replacement - 500' North of W. Tischer to 1,000' North of W. Tischer - CP 0010-295530 Estimated End Date: 09/14/2016
Project Completed Feb. 06, 2017
CP 0011-278904 Roadwork: SAP 69-611-018, CP 0011-278904 (Low) - Mill & Overlay - CSAH 11 (4th St./5th Ave.) from CR 284 (Ugstad Rd.) to 2nd Street - CP 0011-278904 (Low) Estimated End Date: 08/10/2018
Not started.
CP 0013-153307 Roadwork: SAP 69-613-040 Tied, CP 0013-153307 - Mill & Overlay - CSAH 13 (Midway Rd.) from TH 194 to TH 53 - CP 0013-153307 Estimated End Date: 08/10/2016
Construction of Main Roadway complete for season on Saturday October 17, 2015
CP 0013-211986 Roadwork: CP 0013-211986 Tied, Chip Seal: CSAH 14 to TH 2 - CSAH 13 (Midway Rd.) from CSAH 14 to TH 2 - CP 0013-211986 Estimated End Date: 09/02/2016
Not started
CP 0013-247751 TST Roadwork: SAP 69-613-041, CP 0013-247751 TST - Traffic Warning System - CSAH 13 (Midway Rd.) .5 Mi. South of TH 2 - CP 0013-247751 TST Estimated End Date: 06/23/2017
Closeout moved on to final payment processing.
CP 0013-249390 Roadwork: CP 0013-249390 Tied - Chip Seal - 361' N. of TH 2 to TH 194 - CP 0013-249390 Estimated End Date: 09/02/2016
Not started
CP 0013-259418 TST Roadwork: SP 69-070-024, CP 0013-259418 TST - Mainline Dynamic Warning System - Intersection of CSAH 13 and CSAH 45 - CP 0013-259418 TST Estimated End Date: 10/20/2017
All construction completed and in closeout phase.
CP 0013-319131 TST Roadwork: CP 0013-319131, SAP 069-613-042 - Roundabout - Intersection of CSAH 13 (Midway Rd.) and CSAH 6 (Maple Grove Rd.) - CP 0013-319131 Estimated End Date: 10/12/2018
Construction starts June 4.
CP 0014-278072 Roadwork: SAP 069-614-017, CP 0014-278072 (Low Prime) - Mill & Overlay - CSAH 14 (Boundary Ave.) from 400' No. of Mountain Dr. to 5th St. - CP 0014-278072 (Tied) Estimated End Date: 08/31/2018
Construction started May 16.
CP 0014-278073 Roadwork: SAP 069-614-018, CP 0014-278073 (Tied) - Reclaim & Overlay - CSAH 14 (5th St.) from TH 2 to Boundary Ave. - CP 0014-278073 (Tied) Estimated End Date: 08/10/2018
Not started
CP 0016-153268 Roadwork: SAP 69-616-053, CP 0016-153268 (Low) - CSAH 16, Townline Rd from CSAH 7 to TH 53 Estimated End Date: 07/24/2015
Project Complete
CP 0016-153442 TST Roadwork: SAP 69-616-056, CP 0016-153442 TST - Mill & Overlay - CSAH 16 (Townline Rd.) from 1.84 mi W of NFS 118 (Camp 26 Truck Trail) to Lake Co Line - CP 0016-153442 TST Estimated End Date: 09/25/2015
Project Complete
CP 0016-207383 Roadwork: SAP 69-616-054, CP 0016-207383 (Tied) - Reclaim/Overlay - CSAH 16 (Townline Rd.) from CSAH 5 to CSAH 7 - CP 0016-207383 Estimated End Date: 07/24/2015
Project Complete
CP 0016-275997 Roadwork: SAP 69-616-057, CP 0016-275997 (Tied) - Chip Seal - CSAH 16 from TH 73 to CSAH 7 - CP 0016-275997 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0016-289398 TST Roadwork: CP 0016-289398 TST (Low) - Reclaim & Overlay - Itasca County Line to TH 73 - CP 0016-289398 TST (Low) Estimated End Date: 08/11/2017
Not started
CP 0018-289399 TST Roadwork: CP 0018-289399 TST (Tied) - Reclaim & Overlay - Itasca County Line to TH 73 - CP 0018-289399 TST (Tied) Estimated End Date: 08/11/2017
Not started
CP 0021-215030 Roadwork: SAP 69-621-034, CP 0021-215030 TST, Bridge #286 - 1.1 mi N of Jct CSAH 70 over Birch River, CP 0021-215030 TST Estimated End Date: 10/08/2016
Project Completed.
CP 0022-153313 (Tied) Roadwork: CP 0022-153313 (Tied); SAP 069-622-022, CSAH 5 To TH 73- Mill & Bit. Overlay - CSAH 22 (Hwy 22) from CSAH 5 to TH 73 - CP 0022-153313, SAP 069-622-022 Estimated End Date: 08/15/2018
Project Complete
CP 0022-287160 Roadwork: CP 0022-287160 (Tied) - Scrub Seal - TH 73 to TH 53 - CP 0022-287160 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0022-9313 (Tied) Roadwork: CP 0022-9313 TST (Tied), County Line to CSAH5 - Culverts/Reclaim & Overlay - Itasca County Line to CSAH 5 - CP 0022-9313 (Tied) Estimated End Date: 08/15/2018
Project Complete
CP 0023-280020 Roadwork: SAP 69-623-035, CP 0023-280020 (Tied) - Chip Seal - Lakeshore Drive (Nett Lake) to TH 53 - CP 0023-280020 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0023-72711 Roadwork: SP 69-623-032, CP 0023-72711 TST - Reclaim & Overlay - CSAH 23 (Orr-Buyck Rd.) from 0.4 Mi. E. of TH 53 to CSAH 24 - CP 0023-72711 TST, SP 069-623-032 Estimated End Date: 06/30/2017
Project Complete
CP 0024-229056 Roadwork: CP 0024-229056 TST (Low) - Bridge 361 - CSAH 24 (Kallio Rd.) from .65 Mi. West of Jct CR 422 to .55 Mi. West of Jct CR 422, Bridge 361 - CP 0024-229056 TST (Low) Estimated End Date: 12/16/2016
Complete
CP 0024-278063 Roadwork: SAP 69-624-024, CP 0024-278063 (Tied) - Chip Seal - TH 53 to CSAH 115 - CP 0024-278063 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0024-278064 Roadwork: SAP 69-624-023, CP 0024-278064 (Tied) - Chip Seal - CSAH 115 to CR 426 - CP 0024-278064 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0024-338060 (LOW PRIME) Roadwork: CP 0024-338060-GRIP 426 to 8121 - C.R. 426 E. 11.354 Miles to N. Junction of U.T. 8121 Estimated End Date: 09/29/2017
Project Complete
CP 0025-153449 Roadwork: CP 0025-153449 (Tied) - Chip Seal - CSAH 25 (Hwy 25) from TH 37 to TH 169 - CP 0025-153449 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0025-207531 Roadwork: SAP 69-625-013, CP 0025-207531 (Tied)- Reclaim & Overlay - CSAH 25 (Hwy 25) from TH 37 to TH 169 - CP 0025-207531, SAP 069-625-013 Estimated End Date: 07/24/2015
Project Complete
CP 0025-275062 TST (Prime) Roadwork: CP 0025-275062 TST (Prime) - Guardrail - Bridge 679 - .61 Mi. South of CR 958 - CP 0025-275062 TST (Prime) Estimated End Date: 09/29/2017
Project Complete on 8/29/2017
CP 0025-287161 Roadwork: CP 0025-287161 (Tied) - Scrub Seal - CSAH 125 to CSAH 65 (North Junction) - CP 0025-287161 (Tied) Estimated End Date: 09/12/2016
Not Started
CP 0025-287162 Roadwork: CP 0025-287162 (Tied) - Scrub Seal - UT 8163 to CSAH 82 - CP 0025-287162 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0025-365478 (Low) Roadwork: CP 0025-365478 (Low), SAP 069-625-017 CR 661 to TH 37 - Culvert Replacement - CR 661 to TH 37 Estimated End Date: 09/21/2018
Project Complete
CP 0026-275030 (Low) Roadwork: CP 0026-275030 (Low), SAP 069-626-012 TH 169 to TH 135-Reclaim & Overlay - CSAH 26, Wahlsten Rd, D4, P2, TH 169 to TH 135 Estimated End Date: 08/15/2018
Not Started
CP 0026-275994 (Tied) Roadwork: CP 0026-275994 (Tied), SAP 069-626-013 TH 135 to CSAH 21-Reclaim & Overlay - CSAH 26, Wahlsten Rd, D4, P2, TH 135 to CSAH 21 Estimated End Date: 08/15/2018
Not started
CP 0026-304816 Roadwork: CP 0026-304816 (Low) TST; CP 0068-304825 TST (Tied) Culvert Replacement - CR 969 (Forest Rd.) to CSAH 21 - CP 0026-304816 (Low) Estimated End Date: 09/01/2017
Project Complete
CP 0031-249391 Roadwork: CP 0031-249391 Tied - Chip Seal - CSAH 80 (Brookston Rd. W.) to Bridge 146 - CP 0031-249391 Estimated End Date: 09/02/2016
Not started
CP 0032-153443 TST Roadwork: SAP 69-632-022, CP 0032-153443 TST - Reclaim/Overlay/Signals - CSAH 32 (Arrowhead Rd.) from TH 53 to 1,400' E of CSAH 90 - CP 0032-153443 TST Estimated End Date: 10/20/2017
Not started
CP 0032-341774 Roadwork: CP 0032-341774, SAP 069-632-023-Mill & Overlay CSAH 91 to CSAH 90 - 1,510' East of Haines Road to Arlington Avenue-CSAH 32,Arrowhead Rd, Mun. 0118, D5, P2, CSAH 91 (Haines Road) to CSAH 90 (Arlington Ave) Estimated End Date: 08/31/2018
Not started
CP 0033-374587 Tied) Roadwork: CP 0033-374587 - Sealcoating - CSAH 43 (Lismore Rd.) to Bridge over Sucker River Estimated End Date: 09/07/2018
Not started.
CP 0035-244410 TST Roadwork: CP 0035-244410 TST - Reclaim/Overlay & Culverts - CSAH 35 (Schultz Rd.) from CSAH 4 (Rice Lake Rd.) to CSAH 36 (Arnold Rd.) - CP 0035-244410 TST Estimated End Date: 09/08/2017
Not started
CP 0037-290908 Roadwork: CP 0037-290908 (Tied) - Scrub Seal - Glenwood to CSAH 44 (Normanna Rd.) - CP 0037-290908 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0038-283104 TST Roadwork: CP 0038-283104 TST (Low) - Reclaim & Overlay - CSAH 44 (Pequaywan Lake Rd.) to CR 254 (N. Tischer Rd.) - CP 0038-283104 TST (Low) Estimated End Date: 10/28/2016
Termini Signing and Culvert Replacement to started week of 6/13/2016
CP 0040-244394 TST Roadwork: CP 0040-244394 TST (Tied) - Reclaim & Overlay - CSAH 40 (N. Tischer Rd.) from CSAH 43 (Lismore Rd.) to CR 254 (N. Tischer Rd.) - CP 0040-244394 TST (Low) Estimated End Date: 10/28/2016
Termini Signing and Culvert Replacement to started week of 6/13/2016
CP 0041-235496 Roadwork: SAP 069-641-004, CP 0041-235496 - Bridge 70 - 0.1 MI N of JCT CR 253 over West Branch Little Knife River - CP 0041-235496 Estimated End Date: 06/30/2019
Not started
CP 0043-374589 (Tied) Roadwork: CP 0043-374589 - Sealcoating - CR 294 (Pioneer Road) to CSAH 4 (Rice Lake Road) Estimated End Date: 09/07/2018
Not started.
CP 0044-153435 (Tied) Roadwork: CP 0044-153435 SAP 069-644-028 - Mill & Overlay - CR272 (Briar Lake Road) to CSAH 55 Estimated End Date: 08/10/2019
Not started.
CP 0044-300420 TST Roadwork: CP 0044-300420 TST (Tied) - Reclaim & Overlay - 390' N. of UT 9203 to 0.85 Mi. N. - CP 0044-300420 TST (Tied) Estimated End Date: 10/28/2016
Not started
CP 0044-368592 (Low Prime) Roadwork: CP 0044-368592 - Bituminous Reclamation (Low) - CSAH 55 to CSAH 16 Estimated End Date: 08/10/2019
Not started
CP 0044-374595 (Tied) Roadwork: CP 0044-374595 - Sealcoating - CSAH 34 (Howard Gnesen Road) to 0.17 Mi. N. of CR 272 (Barrs Lake) Estimated End Date: 09/07/2018
Not started.
CP 0044-376291 Roadwork: SP 069-644-030 CP 0044-376291 - Bituminous Reclamation - Camp House Road TR 6204 to CR 353 Estimated End Date: 08/10/2019
Not started
CP 0045-249392 Roadwork: CP 0045-249392 Tied - Chip Seal - Carlton County Line to CR 284 (Ugstad Rd.) - CP 0045-249392 Estimated End Date: 09/02/2016
Not started
CP 0047-241967 Roadwork: SAP 69-647-012 Tied, CP 0047-241967 - Chip Seal - CSAH 47 (Swan Lake Rd.) from TH 53 to Eier Rd. - CP 0047-241967, SAP 069-647-012 Estimated End Date: 09/02/2016
Not started
CP 0048-153453 Roadwork: SAP 069-648-030, CP 0048-153452 (Tied) - Mill & Overlay - CSAH 48 (2nd Ave.) from TH 2 to 5th St. - CP 0048-153453 (Tied) Estimated End Date: 08/10/2018
Not started
CP 0048-257711 Roadwork: CP 0048-257711 Tied - Chip Seal - CSAH 48 (Lavaque Bypass Rd.) from TH 53 to CSAH 9 - CP 0048-257711 Estimated End Date: 09/02/2016
Not started
CP 0052-243859 TST Roadwork: SAP 69-652-017, CP 0052-243859 TST - Br 221 - .25 Mi. W. of Jct. CSAH 7 to .15 Mi. W. of Jct CSAH 7 - CP 0052-243859 TST Estimated End Date: 07/14/2017
Not started.
CP 0054-204676 Roadwork: Storm WO 204676 SAP 69-654-005 - Catch Basin Repairs - CSAH 54 (Piedmont Ave.) from Springvale to CSAH 91 (Haines Rd.) - CP 0054-204676 Estimated End Date: 10/17/2014
Project has been completed.
CP 0056-249393 Roadwork: CP 0056-249393 Tied - Chip Seal - CSAH 98 to CSAH 13 - CP 0056-249393 Estimated End Date: 09/02/2016
Not started
CP 0059-229537 Roadwork: SAP 69-659-002, CP 0059-229537 - Bridge 388 - CSAH 59 (Melrude Rd.) 0.7 Mi. West of Jct. County Road 322 Over Paleface River, Bridge 388 - CP 0059-229537 Estimated End Date: 08/05/2017
Complete
CP 0061-292087 Roadwork: CP 0061-292087; SAP 069-661-020 - 2016 Crack Sealing - CSAH 61 from 1200' Est of CSAH 33 to Lake County Line Estimated End Date: 08/26/2016
Not started.
CP 0065-255959 Roadwork: CP 0065-255959 TST (Tied) - Reclaim & Overlay - CSAH 65 from CSAH 5 to Dean Rd - CP 0065-255959 TST (Tied) Estimated End Date: 09/08/2017
Project Complete
CP 0065-365151 (Tied) Roadwork: CP 0065-365151 (Tied), SAP 069-665-006 - Sealcoating - CSAH 5 South to CSAH 5 No. Jct. Estimated End Date: 09/07/2018
Project Complete
CP 0066-363849 (Tied) Roadwork: CP 0066-363849 (Tied) - Storm Sewer & Culvert Replacement - TH 73 to 0.5 miles east Estimated End Date: 09/21/2018
Not started.
CP 0068-260638 Roadwork: SAP 069-668-007, CP 0068-260638 TST (Low) - Reclaim & Overlay - CSAH 68 (Rice River Rd.) from CSAH 68 (Britt Rd.) to TH 169 - CP 0068-260638 TST (Low) Estimated End Date: 08/20/2016
Project Complete
CP 0068-280500 Roadwork: SAP 69-668-006, CP 0068-280500 (Tied) - Chip Seal - CSAH 106 to CR 303 - CP 0068-280500 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0068-298686 (Low Prime) Roadwork: CP 0068-298686 (Low Prime) TST - Reclaim & Overlay - CSAH 68 from TH 169 to CSAH 21 - CP 0068-298686; CR 303 from TH 169 to CSAH 68 - CP 0303-298687; and CR 307 from TH 53 to CR 303 - CP 0307-298688 Estimated End Date: 08/15/2018
Project Complete
CP 0068-304825 TST Roadwork: CP 0068-304825 TST (tied); CP 0026-304816 (Low) - Culvert Replacement - TH 169 to CSAH 21 - CP 0068-304825 TST Estimated End Date: 09/01/2017
Project Complete
CP 0070-304817 Roadwork: CP 0070-304817, SAP 069-670-009 - Culvert Replacement - CSAH 21 to SLC/Lake County Line Estimated End Date: 09/08/2018
Project Complete
CP 0073-249394 Roadwork: CP 0073-249394 Tied - Chip Seal - CSAH 13 (Midway Rd.) to CSAH 45 (Old Hwy 61) - CP 0073-249394 Estimated End Date: 09/02/2016
Not started
CP 0073-276911 (Tied) Roadwork: SAP 069-673-005 CP 0073-276911 - Reclaim & Overlay - CSAH 73 (Eldes Rd.) from Carlton County Line to CSAH 13 (Midway Rd.) Estimated End Date: 08/09/2019
Not started
CP 0074-280501 Roadwork: CP 0074-280501 (Tied) - Chip Seal - CR 472 to TH 53 - CP 0074-280501 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0077-365159 (Tied) Roadwork: CP 0077-365159 (Tied), SAP 069-677-010 - Sealcoating - TH 169 to CR 929 Estimated End Date: 09/07/2018
Project Complete
CP 0080-263813 TST (Low Prime) Roadwork: CP 0080-263813 TST (Low Prime)- Reclaim & Overlay - CSAH 80 (Brookston Rd.) from CSAH 31 to CR 863 - CP 0080-263813 TST Estimated End Date: 09/08/2017
Not started
CP 0082-215031 Roadwork: SAP 69-682-003, CP 0082-215031 TST, Bridge #645 - 0.6 mi E of Jct TH 73 over Gilmore Creek, CP 0082-215031 TST Estimated End Date: 09/17/2016
Project Completed
CP 0087-287163 Roadwork: CP 0087-287163 (Tied) - Scrub Seal - TH 53 to CR 478 - CP 0087-287163 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0089-153306 Roadwork: SAP 69-689-011(Tied), CP 0089-153306, CSAH 89 Bit. Overlay - CSAH 89 (Getchell Rd.) from Skyline Parkway to Stebner Rd Estimated End Date: 07/19/2015
Not started
CP 0089-374601 (Tied) Roadwork: CP 0089-374601 - Sealcoating - 594' N. of Skyline Parkway to CSAH 56 (Morris Thomas Road) Estimated End Date: 09/07/2018
Not started.
CP 0090-257713 TST Roadwork: CP 0090-257713 TST - Sidewalk Construction - CSAH 90 (Arlington Ave.) from TH 194 (Centrance Entrance) to Willow St. CP 0090-257713 TST Estimated End Date: 10/20/2017
Not started
CP 0090-8203 TST Roadwork: SP 69-690-013, CP 0090-8203 TST - Reclaim, Mill, Overlay - CSAH 90 (Arlington Rd.) from STH 53 (Trinity Rd.) to CSAH 32 - CP 0090-8203 TST Estimated End Date: 08/10/2016
Phase one construction complete, Chip seal in mid July.
CP 0091-342006 Roadwork: CP 0091-342006-Int. of CSAH 91 and Mall Dr./Market St. - CSAH 91, Haines Rd, Mun. 0118, D5, P1, CSAH 56 (Morris Thomas Road) to TH 53 Estimated End Date: 10/20/2017
Not started
CP 0097-280502 Roadwork: CP 0097-280502 (Tied) - Chip Seal - TH 37 to CSAH 96 - CP 0097-280502 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0097-340081 (Low) Roadwork: CP 0097-340081 (Low), SAP 069-697-007 - Culvert Replacement - CSAH 20 to CSAH 4 Estimated End Date: 09/14/2018
Project Complete
CP 0098-290909 Roadwork: CP 0098-290909 (Tied) - Scrub Seal - TH 194 to CSAH 7 (Industrial Rd.) - CP 0098-290909 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0099-287573 Roadwork: SAP 069-699-002, CP 0099-287573 - Bridge 460 (tied) - CSAH 16 to .1 Mi. North of CSAH 16 over Hen Creek - CP 0099-287573 Estimated End Date: 08/12/2018
Complete
CP 0099-287574 Roadwork: SAP 069-699-001, CP 0099-287574 - Bridge 467 (tied) - 0.1 Mi. South of CR 650 over stream - CP 0099-287574 Estimated End Date: 08/12/2018
Complete
CP 0099-340082 (Tied) Roadwork: CP 0099-340082 (Tied), SAP 069-699-004 - Culvert Replacement - CSAH 16 to CSAH 100 Estimated End Date: 09/14/2018
Project Complete
CP 0100-367289 Roadwork: CP 0100-367289 Culvert Replacement - 600' north of CSAH 130 Estimated End Date: 09/15/2018
Project started 9-25-18
CP 0101-261099 Roadwork: SP 069-701-005, CP 0101-261099 TST - Mill, Reclaim, Overlay & Seal Coat - CSAH 101 (Fayal Rd.) from CSAH 7 to CSAH 142 Estimated End Date: 07/15/2018
Project Complete
CP 0103-352324 (Tied) Roadwork: CP 0103-352324 (Tied), SAP 069-703-016 CSAH 102 to TH 169 - Culvert Replacement - CSAH 102 to TH 169-CSAH 103, Mud Lake Rd., Mun. 2700, D6, P1, CSAH 102 to TH 169 Estimated End Date: 09/21/2018
Project Complete
CP 0104-365169 (Tied) Roadwork: CP 0104-365169 (Tied), SAP 069-704-005 - Sealcoating - CSAH 77 to end of Bituminous Estimated End Date: 09/07/2018
Project Complete
CP 0110-153277 TST Roadwork: SP 069-710-026, CP 0110-153277 TST - Hot In Place Recycle - CSAH 16 to Hoyt Lakes City Limits - CP 0110-153277 TST Estimated End Date: 07/14/2017
Project Complete
CP 0111-352326 (Tied) Roadwork: CP 0111-352326 (Tied), SAP 069-711-002 - Culvert Replacement - CSAH 4 to CSAH 99-CSAH 111, Palo Rd., D6, P2, CSAH 4 to CSAH 99 Estimated End Date: 09/14/2018
Project Complete
CP 0116-243925 TST Roadwork: CP 0116-243925 TST - Br 367 - 2.45 Mi. E. of Jct. CSAH 24 to 2.55 Mi. E. of Jct. CSAH 24 - CP 0116-243925 TST Estimated End Date: 06/30/2017
Complete
CP 0122-216092 (Low) Roadwork: CP 0122-216092 (Low), SAP 069-722-008 Reclaim & Overlay - CSAH 122 (Gamma Rd.) from TH 53 to CSAH 123, CP 0122-216092 (Low) Estimated End Date: 07/20/2018
Project Complete
CP 0123-216096 (Tied) Roadwork: CP 0123-216096 (Tied), SAP 069-723-007 Reclaim & Overlay - CSAH 123 (Gappa Rd.) from CSAH 122 to CSAH 122, CP 0123-216096 (Tied) Estimated End Date: 07/20/2018
Project Complete
CP 0129-216097 (Tied) Roadwork: CP 0129-216097 (Tied), SAP 069-729-006 Bituminous Overlay - CSAH 129 (Ash River Trail) from TH 53 to end of blacktop, CP 0129-216097 (Tied) Estimated End Date: 07/20/2018
Project Complete
CP 0133-289400 TST Roadwork: CP 0133-289400 TST (Tied) - Reclaim & Overlay - Itasca County Line to TH 73 - CP 0133-289400 TST (Tied) Estimated End Date: 08/11/2017
Not Started
CP 0133-398702 Roadwork: CP 0133-398702 (Low) - Mill & Overlay, Curb & Gutter - Western Avenue to 200' West of Cole Avenue Estimated End Date: 10/12/2018
Not started.
CP 0136-287483 Roadwork: SAP 69-736-001, CP 0136-287483 - Roundabout - Intersection of new CSAH 5 & TH 73 Estimated End Date: 10/15/2017
Not started
CP 0136-298567 Roadwork: CP 0136-298567 - Traffic Signals - Intersection CSAH 136 and MN TH 73 - CP 0136-298567 Estimated End Date: 12/31/2017
Project Complete
CP 0137-317611, SAP 069-737-003 Roadwork: CP 0137-317611, SAP 069-737-003 (BR 550) - Bridge 550 located on CSAH 137 and 0.03 Mi. S. of JCT CR 925 Estimated End Date: 06/21/2019
Road closure and construction to begin 09/17/18
CP 0180-213069 Roadwork: CP 0180-213069 TST, Bridge #867 - CR 180 between TH 53 and Blackduck Lake, CP 0180-213069 TST Estimated End Date: 09/16/2016
Project complete.
CP 0180-259391 Roadwork: CP 0180-259391, Bridge 347 - BR 347 located on CR 180 over Black Duck Creek and 10.8 MI N of Orr, MN - CP 0180-259391 Estimated End Date: 06/30/2019
Began construction on 08/20/18.
CP 0185-243860 TST Roadwork: CP 0185-243860 TST (Bridge 261) - .85 Mi. North of Jct. CR 817 to .95 Mi. North of Jct. CR 817 - CP 0185-243860 TST Estimated End Date: 05/20/2017
Complete
CP 0189-243857 TST Roadwork: CP 0189-243857 TST - Bridge 209 - 1.05 Mi. East of Jct. TH 73 to 1.15 Mi. East of Jct. TH 73 - CP 0189-243857 TST Estimated End Date: 12/09/2018
Complete
CP 0196-243856 TST Roadwork: CP 0196-243856 TST - Bridge 197 - .95 Mi. South of Jct. CSAH 133 to .85 Mi. South of Jct. CSAH 133 - CP 0196-243856 TST Estimated End Date: 08/12/2016
Complete
CP 0209-243855 TST Roadwork: CP 0209-243855 TST - Bridge 194 - .65 Mi. North of Jct. CSAH 133 to .75 Mi. North of Jct. CSAH 133 - CP 0209-243855 TST Estimated End Date: 09/20/2017
Not started
CP 0223-244397 TST Roadwork: CP 0223-244397 TST (Low) - Reclaim & Overlay/Culverts - CR 223 (Munger Shaw Rd.) from CR 696 (St. Louis River Rd.) to CSAH 6 (Maple Grove Rd.) - CP 0223-244397 TST (Low) Estimated End Date: 08/11/2017
Culvert Replacement starting
CP 0223-305077 Roadwork: CP 0223-305077 - Concrete Box Culvert - 0.57 Mi. South of Hwy 53 - CP 0223-305077 Estimated End Date: 09/29/2017
Not started
CP 0254-244395 TST Roadwork: CP 0254-244395 TST (Tied) - Reclaim & Overlay - CR 254 (N. Tischer Rd.) from CSAH 40 (Pioneer Rd.) to CSAH 38 (Normanna Rd.) - CP 0254-244395 TST (Tied) Estimated End Date: 10/28/2016
Termini Signing and Culvert Replacement to started week of 6/13/2016
CP 0259-153437 TST Roadwork: CP 0259-153437 TST (Tied) - Reclaim & Overlay - CR 259 (W. Beyer Rd.) from CSAH 4 (Rice Lake Rd.) to CSAH 34 (Howard Gnesen Rd.) - CP 0259-153437 TST (Tied) Estimated End Date: 10/28/2016
Reclaiming existing bituminous surface week of 6/27/2016
CP 0261-378873 (Tied) Roadwork: CP 0261-378873 - Bituminous Reclamation - Carlton County Line to CSAH 73 Estimated End Date: 08/09/2019
Not started
CP 0266-317609 Roadwork: CP 0266-317609, Br 65 located on CR 266 - BR 65 located on CR 266 (Fox Farm Rd) over the Sucker River Estimated End Date: 06/24/2019
Not started.
CP 0274-273921 Roadwork: CP 0274-273921 Tied, Reclamation, Bit. Seal Coat - CR 274 (Thompson Lake Rd.) from CSAH 4 (Rice Lake Rd.) to TR 2616 (Tracy Rd.) Estimated End Date: 09/02/2016
Reclaimed, bituminous surfacing starting 7/18/2016.
CP 0280-153456 TST Roadwork: CP 0280-153456 TST (Tied) - Reclaim & Overlay - CR 289 (Woodland Ave.) to CR 245 (Washburn Rd) - CP 0280-153456 TST (Tied) Estimated End Date: 10/28/2016
Culvert Replacement Started
CP 0284-295016 TST Roadwork: CP 0284-295016 TST (Tied) - Reclaim & Overlay - Lavaque Bypass (CSAH 48) to Martin Rd. (CSAH 9) - CP 0284-295016 TST (Tied) Estimated End Date: 08/11/2017
Not started
CP 0289-153458 TST Roadwork: CP 0289-153458 TST (Tied) - Reclaim & Overlay - CSAH 10 (Martin Rd) to CSAH 2 (Tischer Rd) - CP 0289-153458 TST (Tied) Estimated End Date: 10/28/2016
Culvert Replacement Started
CP 0290-279351 Roadwork: CP 0290-279351 - Bituminous Overlay - Duluth City Limits to McQuade Rd. - CP 0290-279351 Estimated End Date: 10/15/2018
Not started.
CP 0296-319589 Roadwork: CP 0296-319589 Culverts-400' North of Airbase Rd to 1750' north - CR 296, Airport Approach Rd, Mun. 0202, D5, P2, CSAH 17 (Air Base Rd) N to intersection by FEDEX Estimated End Date: 10/20/2017
Not started
CP 0297-284942 TST Roadwork: CP 0297-284942 TST (Tied) - Reclaim & Overlay - South Termini to CSAH 48 (Lavaque Bypass) - CP 0297-284942 TST (Tied) Estimated End Date: 08/11/2017
Not started
CP 0303-328289 TST (Low Prime) Roadwork: CP 0303-328289 TST (Low Prime), Bridge Railing Transitions w W-Beam Guardrail - 4 Bridges on Various County Highways within St. Louis County Estimated End Date: 06/29/2018
Not started
CP 0329-281201 Roadwork: CP 0329-281201 (Tied) - Chip Seal - TH 37 to CR 776 - CP 0329-281201 (Tied) Estimated End Date: 09/02/2016
Not started
CP 0332-257646 Roadwork: CP 0332-257646 GRIP (tied) - CR 332 (Northern Lights Rd.) from CSAH 122 to 1.3 Mi. East - CP 0332-257646 Estimated End Date: 07/20/2018
Project Complete
CP 0341-352327 (Tied) Roadwork: CP 0341-352327 (Tied) - Culvert Replacement - End of Bituminous to TWP 6528-CR 341, Stepetz Rd., D6, P2, 2.4 miles N of TR 6627 to TR 6528 Estimated End Date: 09/14/2018
Project Complete
CP 0375-259415 Br 514 (Low) Roadwork: CP 0375-259415 (Low) Br 514 - 0.5 miles South of CSAH 21 on CR 375 Estimated End Date: 08/11/2018
Vegetation is established and all work completed prior to Contract Completion Date of 08/11/18.
CP 0383-281189 Roadwork: CP 0383-281189 (Tied) - Chip Seal - CR 329 to End of Pavement - CP 0383-281189 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0393-298690 (Tied) Roadwork: CP 0393-298690 (Tied) - Culvert Replacement - 0.3 Mi. West of CSAH 20 - CP 0393-298690 (Tied) Estimated End Date: 09/14/2018
Project Complete
CP 0395-255958 Roadwork: CP 0395-255958 (Tied) - Reclaim & Overlay - CR 395 from CSAH 5 to Dean Rd. - CP 0395-255958 (Tied) Estimated End Date: 09/08/2017
Project Complete
CP 0405-265708 Roadwork: CP 0405-265708 (Tied) - Reclaim & Overlay - CSAH 68 to North Termini - CP 0405-265708 (Tied) Estimated End Date: 08/20/2016
Project Complete
CP 0411-153311 (Tied) Roadwork: CP 0411-153311 (Tied) - Mill & Overlay - CR 411 (Wiseman Rd.) from CSAH 26 to TH 135 - CP 0411-153311 (Tied) Estimated End Date: 07/27/2018
Not started
CP 0421-312073 (Tied) Roadwork: CP 0421-312073 (Tied) Br 299 - CR 421, Sassass Rd., D4, P3, TH 1 to CSAH 87 (BR 299) Estimated End Date: 09/29/2018
Not started
CP 0431-213066 Roadwork: CP 0431-213066 TST - Bridge #323 - CR 431 (Short Rd.) between CR 948 (Johnson Rd.) and CSAH 115 (Hwy 115), CP 0431-213066 TST Estimated End Date: 06/30/2016
Complete
CP 0442-215028 Roadwork: CP 0442-215028 TST, Bridge #883 - 0.2 mi w of Jct CR 444 over East Swan River, CP 0442-215028 TST Estimated End Date: 08/13/2016
Project Complete.
CP 0481-271724 (Low) Roadwork: CP 0481-271724 (Low) - Bridge 774 - BR 774 located on CR 481, CP 0481-271724 (Low) Estimated End Date: 06/30/2019
Not started
CP 0483-276897 Roadwork: CP 0483-276897 (Tied) - Reclaim & Overlay - CR 982 (Old Miller Trunk) to CR 982 (Old Miller Trunk) - CP 0483-276897 (Tied) Estimated End Date: 09/02/2016
Construction started May 16, 2016. No work on roadway yet.
CP 0488-190852 Roadwork: CP 0488-190852 TST - Bridge #656 - CR 488 .3 Mi. North of Jct. TH 533 Over Flint Creek - CP 0488-190852 TST Estimated End Date: 08/27/2016
Complete
CP 0491-271722 (Tied) Roadwork: CP 0491-271722 (Tied) - Bridge 646 - BR 646 located on CR 491, CP 0491-271722 (Tied) Estimated End Date: 06/30/2019
Not started
CP 0492-213057 Roadwork: CP 0492-213057 TST - Bridge 303 - CR 492 (Anton Rd.) from CR 912 (Ralph Rd.) to TH 53 - CP 0492-213057 TST Estimated End Date: 11/13/2015
Complete
CP 0523-216098 (Tied) Roadwork: CP 0523-216098 (Tied), Reclaim & Overlay - CR 523 (Burma Rd.) from CSAH 123 to Lake Kabetogama, CP 0523-216098 (Tied) Estimated End Date: 07/20/2018
Project Complete
CP 0523-243941 Roadwork: CP 0523-243941 (Br 823) - CR 523 (Burma Rd.) .25 Mi. NE of Jct CSAH 123 to .35 Mi. NE of Jct CSAH 123 - CP 0523-243941 Estimated End Date: 11/04/2017
Not started
CP 0526-298689 (Tied) Roadwork: CP 0526-298689 (Tied) - Reclaim & Overlay - TH 169 to TH 169 - CP 0526-298689 (Tied) Estimated End Date: 07/27/2018
Not started
CP 0540-243937 TST Roadwork: CP 0540-243937 TST (Bridge 705) - .45 Mi. West of Jct. CR 937 to .35 Mi. West of Jct. CR 937 - CP 0540-243937 TST Estimated End Date: 08/20/2016
Complete
CP 0547-375668 (Low Prime) Roadwork: CP 0547-375668 - (Low Prime) - From UT 9230 E. 11.40 Miles to CSAH 44 Estimated End Date: 08/25/2018
Not started
CP 0588-295995 Roadwork: CP 0588-295995 TST (Tied) - Reclaim & Overlay - CR 588 from 800’ W of County Line to CR 588 North Termini - CP 0588-295995 TST (Tied) Estimated End Date: 09/08/2017
Project Complete
CP 0594-281187 Roadwork: CP 0594-281187 (Tied) - Chip Seal - TH 37 to End of Pavement - CP 0594-281187 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0597-243861 TST Roadwork: CP 0597-243861 TST (Low) - Bridge 355 - .25 Mi. North of Jct. CR 936 to .35 Mi. North of Jct. CR 936 - CP 0597-243861 TST (Low) Estimated End Date: 11/23/2016
Complete
CP 0611-213067 Roadwork: CP 0611-213067 TST, Bridge #783 - CR 611 (Hopper Rd.) between Stone Lake Bridge Rd. and CSAH 44, CP 0611-213067 TST Estimated End Date: 08/31/2016
Complete
CP 0642-243938 TST Roadwork: CP 0642-243938 TST - Bridge 773 - .65 Mi. East of Jct. CSAH 5 to .75 Mi. East of Jct. CSAH 5 - CP 0642-243938 TST Estimated End Date: 09/16/2017
Complete
CP 0672-257647 Roadwork: CP 0672-257647 GRIP (tied) - CR 672 (Salmi Rd.) from CSAH 122 to E. Termini - CP 0672-257647 Estimated End Date: 07/20/2018
Project Complete
CP 0673-216099 (Tied) Roadwork: CP 0673-216099 (Tied), Reclaim & Overlay - CR 673 (Gamma Rd.) from CSAH 122 to end of blacktop, CP 0673-216099 (Tied) Estimated End Date: 07/20/2018
Project Complete
CP 0673-333644 (tied) Roadwork: CP 0673-333644 (tied), GRIP - CR 673 (Gamma Rd.) from CSAH 122 to end of blacktop except first .27 Estimated End Date: 07/20/2018
Project Complete
CP 0675-244408 TST Roadwork: CP 0675-244408 TST (Tied) - Reclaim/Overlay & Culverts - CR 675 (Arnold Rd.) from CSAH 43 (Lismore Rd.) to CSAH 44 (Normanna Rd.) - CP 0675-244408 TST (Tied) Estimated End Date: 10/28/2016
Termini Signing and Culvert Replacement to started week of 6/13/2016
CP 0694-263697 TST (Low Prime) Roadwork: CP 0694-263697 TST - Reclaim & Overlay - CR 694 (Seville Rd.) from CSAH 46 (Saginaw Rd.) to CR 853 (Kroll Rd.) - CP 0694-263697 TST Estimated End Date: 08/10/2018
Not started
CP 0695-257650 Roadwork: CP 0695-257650 GRIP (tied) - CR 695 (Ness Rd.) from CSAH 122 to E. Termini - CP 0695-257650 Estimated End Date: 07/20/2018
Project Complete
CP 0696-185317 Roadwork: SAP 69-598-054, CP 0696-185317 BR 123 on CR 696 - BR 123 on CR 697 0.65 Mi. W. of Jct CSAH 13 to .75 Mi. W. of Jct. CSAH 13 Estimated End Date: 08/01/2015
Complete
CP 0708-287165 Roadwork: CP 0708-287165 (Tied) - Scrub Seal - TH 169 to CR 661 - CP 0708-287165 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0753-257708 TST Roadwork: CP 0753-257708 TST (Tied) - Reclaim & Overlay - CR 753 from CR 473 to .25 Mi. N. of CR 473 - CP 0753-257708 TST (Tied) Estimated End Date: 09/08/2017
Project Complete
CP 0753-257710 Roadwork: CP 0753-257710 TST (Tied) - Reclaim & Overlay - CR 753 between Itasca County Line and CSAH 65 - CP 0753-257710 TST (Tied) Estimated End Date: 09/08/2017
Project Complete
CP 0769-229625 Roadwork: CP 0769-229625 TST, Bridge 709 - CR 769 (Willow River JCT RD) from 1.5 MI S of JCT CSAH 74 to .95 MI S of JCT CSAH 74, Bridge 709 - CP 0769-229625 TST Estimated End Date: 09/30/2017
Complete
CP 0776-281205 Roadwork: CP 0776-281205 (Tied) - Chip Seal - CSAH 7 to CR 329 - CP 0776-281205 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0779-243926 TST Roadwork: CP 0779-243926 TST (Tied) - Bridge 369 - .15 Mi. West of Jct. CR 597 to .05 Mi. West of Jct. CR 597 - CP 0779-243926 TST (Tied) Estimated End Date: 09/01/2017
Complete
CP 0837-299737 TST Roadwork: CP 0837-299737 TST - Reclaim & Overlay - CR 832 to CR 186 - CP 0837-299737 TST Estimated End Date: 08/11/2017
Not started
CP 0889-241305 Roadwork: CP 0889-241305 Tied - Reclaim & Overlay (TST) - CR 889 (Solway Rd.) from CSAH 6 (Maple Grove Rd.) to CR 890 (Rose Rd.), CP 0889-241305 Estimated End Date: 08/10/2016
Construction of Main Roadway complete for season on Saturday October 17, 2015
CP 0890-241304 Roadwork: CP 0890-241304 Tied - Reclaim & Overlay (TST) - CR 859 (Caribou Lake Rd.) to CR 889 (Solway Rd.) - CP 0890-241304 Estimated End Date: 08/10/2016
Construction of Main Roadway complete for season on Saturday October 17, 2015
CP 0894-277234 (Tied) Roadwork: CP 0894-277234 - Bituminous Reclamation - Carlton County Line to CSAH 13 (Midway Road) Estimated End Date: 08/09/2019
Not started
CP 0897-276912 TST Roadwork: CP 0897-276912 TST (Tied) - Reclaim & Overlay - CR 897 (Ratika Rd.) from CR 889 (Solway Rd.) to .3 Mi. East of CSAH 13 (Midway Rd.) - CP 0897-276912 TST (Tied) Estimated End Date: 08/11/2017
Not started
CP 0898-249395 Roadwork: CP 0898-249395 Tied - Chip Seal - CSAH 73 (Old Hwy 61) to CSAH 19 (St. Louis River Rd.) - CP 0898-249395 Estimated End Date: 09/02/2016
Not started
CP 0910-287166 Roadwork: CP 0910-287166 (Tied) - Scrub Seal - CSAH 24 to CSAH 78 - CP 0910-287166 (Tied) Estimated End Date: 09/12/2016
Not started
CP 0916-243933 TST Roadwork: CP 0916-243933 TST (Bridge 650) - .25 Mi. North of Jct. CSAH 22 to .35 Mi. North of Jct. CSAH 22 - CP 0916-243933 TST Estimated End Date: 09/02/2016
Complete
CP 0921-281207 Roadwork: CP 0921-281207 (Tied) - Chip Seal - TH 135 to TH 135 - CP 0921-281207 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 0936-213059 Roadwork: CP 0936-213059 TST (Tied) - Bridge #305 - CR 936 (W. Hannula Rd.) between CR 597 (Arola Rd.) and TH 53, CP 0936-213059 TST (Tied) Estimated End Date: 11/23/2016
Complete
CP 0937-243934 TST Roadwork: CP 0937-243934 TST - Bridge 655 - .25 Mi. South of Jct. CR 540 to .15 Mi. South of Jct. CR 540 - CP 0937-243934 TST Estimated End Date: 06/30/2017
Complete
CP 0938-235515 TST Roadwork: CP 0938-235515 TST - Bridge 657 - .6 miles N. of Jct. TH1 on CR 938 (Alango Rd.) over Flint Creek - CP 0938-235515 TST Estimated End Date: 12/15/2017
Complete
CP 0965-128462 Roadwork: CP 0965-128462, BR 587 - CR 965 (Hingeley Rd.) from .45 Mi. North of Jct. CR 927 to .55 Mi. North of Jct. CR 927 - County Bridge# 587 - CP 0965-128462, SAP 069-598-055 Estimated End Date: 09/30/2016
Project complete.
CP 0982-248043 TST Roadwork: CP 0982-248043 TST - Mill & Overlay - CR 982 (Old Hwy 53) from CSAH 15 (Munger Shaw Rd.) to CSAH 13 (Midway Rd.) - CP 0982-248043 TST Estimated End Date: 09/02/2016
Construction started May 16, 2016. Culvert and storm sewer work in progress.
CP 0999-216100 Roadwork: CP 0999-216100 Tied (TST), Reclaim & Overlay - CR 999 (N. Pike Lake Rd.) from CSAH 9 (Caribou Lake Rd.) to CSAH 9 (Helm Rd.), CP 0999-216100 (TST Funds) Estimated End Date: 08/10/2016
Construction of Main Roadway complete for season on Saturday October 17, 2015
CP 139644 Roadwork: SAP 69-621-033, Bridge 519, CP 0021-139644 - CSAH 21 0.35 mi. W of CR 775 to 0.25 mi W of CR 755, CP 0021-139644 Estimated End Date: 11/01/2013
Project complete.
CP 155964 Roadwork: MP 409-155964 Reconstruct - CR 409 0.25 mi N of CR 411 to 0.5 mi N of CR 411 Estimated End Date: 10/05/2012
Project Complete
CP 176330 Roadwork: SAP 69-710-025 Br 488 Reconstruction - 0.7 Mi. W of CR 633 Estimated End Date: 11/23/2016
Project Complete.
CP 63797 Roadwork: SAP 69-616-049(Low) Reclaim & Overlay TST - CSAH 4 to 1.84 mi W of NFS 118 - CP 0016-63797 TST Estimated End Date: 09/25/2015
Project Complete
CP 8103-281204 Roadwork: CP 8103-281204 (Tied) - Chip Seal - CSAH 65 to End of Pavement - CP 8103-281204 (Tied) Estimated End Date: 09/02/2016
Not started
CP 8116-265709 Roadwork: CP 8116-265709 (Tied) - Reclaim & Overlay - CR 405 to North Termini - CP 8116-265709 (Tied) Estimated End Date: 08/20/2016
Project Complete
CP 8121-247641 Roadwork: SAP 69-599-040 TST, CP 8121-247641 (Tied) - Bridge 344 - UT 8121 (County Rd. 422) between .35 Mi. South of Jct. CSAH 24 to .45 Mi. South of Jct. CSAH 24 - CP 8121-247641 (Tied) Estimated End Date: 12/16/2017
complete
CP 8128-235517 Roadwork: CP 8128-235517, SAP 069-599-041 - Bridge 726 - UT 8128 between CSAH 5 and CR 134 Estimated End Date: 09/01/2017
Not started
CP 8131-296650 Roadwork: CP 8131-296650 (Tied) - Reclaim & Overlay - UT 8131 from CR 134 to Dewey Point Rd. - CP 8131-296650 (Tied) Estimated End Date: 09/08/2017
Project Complete
CP 8146-271566 Roadwork: CP 8146-271566 SAP 069-599-043 - Bridge 818 - 0.5 Mi. South of TH 53 and East of Ash Lake - CP 8146-271566 (Bridge 818) Estimated End Date: 09/14/2019
Contractor mobilization and construction of temporary bridge for road bypass to begin Monday 06/18/18.
CP 8169-281193 Roadwork: CP 8169-281193 (Tied) - Chip Seal - CSAH 68 to End of Pavement - CP 8169-281193 (Tied) Estimated End Date: 09/02/2016
Not started
CP 8181-281206 Roadwork: CP 8181-281206 (Tied) - Chip Seal - UT 8169 to End - CP 8181-281206 (Tied) Estimated End Date: 09/02/2016
Not started
CP 8188-281188 Roadwork: CP 8188-281188 (Tied) - Chip Seal - UT 8116 to UT 8116 - CP 8188-281188 (Tied) Estimated End Date: 09/02/2016
Not started.
CP 9215-271719 TST Roadwork: CP 9215-271719 TST - Bridge 411 (tied) - .6 Mi. South of CSAH 16 - CP 9215-271719 TST (Bridge 411) Estimated End Date: 07/01/2017
Complete
CP 9220-153305 Roadwork: CP 9220-153305 (Tied), Reclaim & Overlay - UT 9220 from CSAH 4 to UT 9231 - CP 9220-153305 (Tied) Estimated End Date: 09/25/2015
Project Complete
CP 9230-271723 TST Roadwork: CP 9230-271723 TST, SAP 069-599-042 - Bridge 755 (low) - 12.6 miles East of Cotton over Coolidge Creek - CP 9230-271723 TST (Bridge 755) Estimated End Date: 09/30/2017
Complete
CP 94576 Roadwork: SAP 69-614-016(Low) TST Cold In Place Recycle - Midway Township Estimated End Date: 09/02/2016
Contractor started work on this contract May 16, 2016. No work on this roadway yet.
CP 97040 Roadwork: SAP 69-666-006 Bridge 619 - CSAH 66 0.40 mi. W. of CSAH 25 to CSAH 25 Estimated End Date: 10/27/2012
Project complete
CP 97049 Roadwork: MP 97049 South Crushing 2012 - Various pits south St. Louis County Estimated End Date: 09/27/2012
10/03/12 Working in Final pit at this time.
CP_0000-375664 (Tied) Roadwork: CP 0000-375664 - Bituminous Reclamation - Carlton County East Highway 61 to County Line (SLC CSAH 73) Estimated End Date: 08/09/2019
Not started
SAP 069-652-019, CP 0052-300237 (Tied) Roadwork: SAP 069-652-019, CP 0052-300237 (Tied), Br 216 - CSAH 52, Arkola Rd, D6, P3, CSAH 7 to TH 53, CP 0052-300237 (Tied) Estimated End Date: 09/07/2018
Not started
SAP 069-700-016, CP 0100-313756 (Low) Roadwork: SAP 069-700-016, CP 0100-313756 (Low) - Br 489 - 1.7 Mi. South of the City of Aurora over St. Louis River - CP 0100-313756 (Low), SAP 069-700-016 (Br 489) Estimated End Date: 07/28/2018
Not started
SAP 69-688-009 Roadwork: SAP 069-688-009, CP 0088-9577 Bridge 336 - ELY, MN Estimated End Date: 06/30/2018
Complete on June 18th, 2018.
SP 69-090-018 Roadwork: SP 69-090-018 CP 0000-3623, Mesabi Trail McKinley - Biwabik - McKinley to Biwabik Estimated End Date: 10/15/2015
Not started
SP 69-090-021 Roadwork: SP 69-090-021 Mesabi Trail Soudan to Tower, CP 0000-3636 - East of Tower, MN, CP 0000-3636 Estimated End Date: 02/23/2016
Project Complete
SP 69-691-020 Roadwork: SP 69-691-020(Low) SP 69-691-027, 8th to Morris Thomas CP 0091-8269 (FILE IN STORM 163282) - Duluth, MN CP 0091-8269 (FILE IN STORM 163282) Estimated End Date: 10/18/2013
Project Completely Done.
Storm WO 160635 Roadwork: Storm WO 160635(tied) CR 694 - CR 694 500' E of Caribou Lake Rd Estimated End Date: 10/12/2012
Work has been completed.
Storm WO 160743 Roadwork: Storm WO 160743(Low) (10 Work Orders) SAP 69-656-015 from TH 33 to 11 miles East - CSAH 56 from TH 33 to 11 miles East Estimated End Date: 10/12/2012
All work has been completed.
Storm WO 161489A Roadwork: Storm WO 161489A--CSAH 48 Storm Sewer System Cleaning - CSAH 48 From CSAH 6 to US Hwy 2 Estimated End Date: 11/30/2012
Not started
STORM WO 176509 Roadwork: Storm WO 176509 SAP 69-689-004 (Low) complete rebuild - Duluth, MN Estimated End Date: 07/17/2015
Complete
Storm WO 183085 Roadwork: Storm WO 183085 SAP 69-689-010 (tied) BR 812 - CSAH 89 .8 Mi. W. of 57th Ave. W. - Br 812 Over Keene Creek Estimated End Date: 07/19/2015
Complete

Planning Projects

These projects are not yet open for bid and are subject to change
Project ID Project No. Description Construction Location Anticipated Bid Date
CP 0004-394814 (Low) (subject to change) SAP 069-604-083 (subject to change) CP 0004-394814 (Low), SAP 069-604-083 - Sealcoating 1.3 Mi. S. of UT 9230 (Brimson Rd)...  Nov 2018
CP 0005-394815 (Tied) (subject to change) SAP 069-605-053 (subject to change) CP 0005-394815 (Tied), SAP 069-605-053 - Sealcoating CSAH 92 to TH 169  Nov 2018
CP 0005-423597 (Tied) (subject to change) SAP 069-605-052 (subject to change) CP 0005-423597 (Tied), SAP 069-605-052 - Sealcoating TH 1 to CSAH 114 (End of...  Nov 2018
CP 0016-394817 (Tied) (subject to change) SAP 069-616-058 (subject to change) CP 0016-394817 (Tied), SAP 069-616-058 - Sealcoating CSAH 7 to TH 53  Nov 2018